My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25I - AGMT - PARK LANDSCAPE MAINT
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2012
>
06/04/2012
>
25I - AGMT - PARK LANDSCAPE MAINT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/4/2012 9:03:32 AM
Creation date
5/31/2012 4:35:43 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Parks, Recreation, & Community Services
Item #
25I
Date
6/4/2012
Destruction Year
2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br /> <br /> <br /> <br /> 5.3.2 Plastic Sheeting and Duct Tape: Used to wrap hand tamp head <br /> and help prevent wet clay from sticking. <br /> 5.3.3 Grade or Grooming Rake: Used to rake and fine level areas. <br /> Shall be made of aluminum, 36" wide and a 6' handle. <br /> <br /> 5.3.4 Heavy Shovels: Used to move material. Round/Square <br /> Point and Scoop shovels. <br /> <br /> 5.3.5 Heavy Duty Hose: Used to water down skinned area. Shall be <br /> 3/4" to 1" top quality construction with 225-psi working <br /> pressure. Leaks of any kind are not permitted. Contractor shall <br /> have a minimum of 175' of hose on hand at all times. <br /> 5.3.6 High Pressure Nozzle: Attached to hose. Use to spray down <br /> brickdust and push excess brickdust off turf edges. <br /> <br /> 5.3.7 Industrial Push Broom: Used to remove excess brickdust from <br /> turf edges. Shall be 24" min. wide with heavy-duty dual weight <br /> bristles. <br /> <br /> 5.4 Wet Conditions Equipment" (Add to equipment above) <br /> During periods of inclement weather or when the areas are wet the contractor <br /> shall have "on-hand" during all brickdust maintenance operations the following <br /> items: <br /> 5.4.1 Squeegee: Used to push/squeeze water off wet areas or into dry <br /> areas or drains. Shall be 24" to 36" wide with neoprene blade <br /> and magnesium/aluminum head. <br /> <br /> 5.4.2 "Super SopRer": Used to collect standing water in brickdust <br /> areas. Shall be drum type with exterior sponge and arm holding <br /> drum. <br /> 5.4.3 Diamond or Beckson Pump: Used to remove standing water in <br /> brickdust areas. Shall be plastic with flexible piston and value. <br /> <br /> 5.4.4 Infield Sopper with Wringer and Bucket: Used to collect <br /> standing water in brickdust areas. Sopper shall be geotextile- <br /> covered sponge typical for absorbing chemical spills. <br /> <br /> 6.0 Meetings <br /> 6.1 Contractor shall provide City of Santa Ana staff with a contact person and a <br /> phone number to reach the contact person from the hours of 6:30am - 5:00pm, <br /> Monday - Saturday. <br /> <br /> 6.2 Contractor shall appoint and identify to City of Santa Ana staff a "site <br /> supervisor". This site supervisor shall meet with staff as requested at time and <br /> place agreed upon by both parties for as long as the contract is in effect to discuss <br /> any problems/concerns that may arise and any goals for the week. <br /> <br /> 32 <br /> 251-42 <br />
The URL can be used to link to this page
Your browser does not support the video tag.