My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25I - AGMT - PARK LANDSCAPE MAINT
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2012
>
06/04/2012
>
25I - AGMT - PARK LANDSCAPE MAINT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/4/2012 9:03:32 AM
Creation date
5/31/2012 4:35:43 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Parks, Recreation, & Community Services
Item #
25I
Date
6/4/2012
Destruction Year
2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br /> <br /> <br /> <br /> Note: The tamp will be most effective if you cover the <br /> bottom with plastic. Tape the plastic to the tamp <br /> handle. The plastic keeps the clay from sticking <br /> to the tamp's bottom. <br /> 7.3.7 After tamping and compacting the "mound mix" covers areas <br /> with infield brick dust. <br /> <br /> 7.4 Pitcher's Mound <br /> <br /> 7.4.1 Follow same procedure for repair of home plate/batters box area <br /> utilizing dry "mound mix" for this purpose. Do not cover with <br /> infield mix. <br /> 7.4.2 Add to the above the following: Rake all loose material from <br /> bottom to top and cover with "Mound Mix". <br /> <br /> 7.5 General Brickdust Skinned Infield Areas <br /> <br /> 7.5.1 After raking/shoveling loose material from high spots back into <br /> low spots/worn areas on running paths, sliding zones, and any <br /> other low spots/worn areas appearing on the field, the Contractor <br /> shall fill all remaining low spots with new Gail Materials "Pro <br /> Gold with Stabilizer" brickdust from stock and make level. <br /> 7.5.2 The contractor shall clean all excess brickdust beneath or next to <br /> the backstop, dugout chain link fencing and/or infield chain link <br /> fence lines so that the infield brickdust is level with the dugout <br /> pavement and pavement outside the infield. <br /> <br /> 7.5.3 Lightly water entire infield before dragging. <br /> <br /> Note: Watering shall penetrate brickdust to a minimum <br /> depth of 1/8" deep min. This process is crucial <br /> to keeping brickdust in place and not going air <br /> borne. <br /> 7.5.4 Drag infield utilizing small utility vehicle as specified with <br /> "grooming or finishing drag". Circular or figure eight drag <br /> patterns shall be used (see details 1-A & 1-B). Alternate drag <br /> patterns or reverse direction of drag patterns daily to avoid ruts <br /> and high/low areas. Speed of drag procedure shall not exceed 7 <br /> mph. <br /> 7.5.5 When dragging the skinned infield, the contractor shall stay <br /> away from all turf edges a minimum of 18". This will help in <br /> avoiding lips at brickdust/turf edges. This 18' gap shall also <br /> apply to all backstops and chain link fence areas. <br /> <br /> 7.5.6 Contractor shall hand rake all base paths on combination <br /> turf/brickdust infields. <br /> 34 <br /> <br /> 251-44 <br />
The URL can be used to link to this page
Your browser does not support the video tag.