My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25I - AGMT - PARK LANDSCAPE MAINT
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2012
>
06/04/2012
>
25I - AGMT - PARK LANDSCAPE MAINT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/4/2012 9:03:32 AM
Creation date
5/31/2012 4:35:43 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Parks, Recreation, & Community Services
Item #
25I
Date
6/4/2012
Destruction Year
2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br /> <br /> <br /> <br /> <br /> 7.5.7 When the dragging process is complete, the contractor shall stop <br /> the drag in a different location daily. This will stop the <br /> accumulation of brickdust in focused areas. At this time roll-up <br /> the drag, place it on the vehicle and remove all debris <br /> accumulated in the drag at this spot and rake out material <br /> emptied from drag. <br /> 7.5.8 After dragging, hand rake the 18" edges using the "grade or <br /> grooming rake". The rake shall be held at an angle as to not <br /> push brickdust onto/into turf areas. <br /> <br /> 7.5.9 After raking the 18" edges, the contractor shall clean all excess <br /> brickdust on the turf edges utilizing a high pressure water nozzle <br /> or heavy duty broom. NO brickdust shall be permitted on the <br /> turf edges at any time.If in the determination of City staff, an <br /> unsafe lip situation exists (an unsafe lip is '/z" or greater) in any <br /> turf/brickdust border area infield to brickdust, base-paths or <br /> brickdust to outfield), contractor will be required to remove or <br /> level the soil build-up with a sod cutter and re-establish the in- <br /> field boundaries with a string line or suitable method and re-sod <br /> up to the border to remedy the situation at contractors expense. <br /> Pre-existing conditions shall be corrected during contract start- <br /> up. <br /> 7.6 Final Watering <br /> 7.6.1 This is the most time consuming and a very important element of <br /> the procedure. <br /> <br /> 7.6.2 The contractor shall final water the skinned brickdust to a depth <br /> of/4" minimum. <br /> 8.0 Rainy Weather/Wet Field Procedure <br /> <br /> 8.1 On the next scheduled working day after a rainfall, the following procedure, in <br /> the order listed, shall be adhered to: <br /> <br /> 8.1.1 Remove all standing water from low spots either by skimming <br /> off excess water and spreading it out to dry areas or using a <br /> pump/sopper system. <br /> <br /> 8.1.2 Rake out (scarify) wet areas. <br /> 8.1.3 Apply Dry Gail Materials "Pro Gold with Stabilizer" Brickdust <br /> Materials from stock to all Wet Areas and Rake Out. <br /> <br /> <br /> <br /> <br /> 9.0 Work to be Completed "BI-MONTHLY" <br /> 35 <br /> <br /> 251-45 <br />
The URL can be used to link to this page
Your browser does not support the video tag.