Laserfiche WebLink
2010 — 2012 CUSTOMIZED SOLUTIONS AGREeMENT <br />TERMS AND CONDITIONS <br />FOR LOCAL GOVERNMENT AND INSTITUTIONAL PARTNERSHIPS <br />This Customized Solutions Agreement ( "Agreement") is entered Into by Southern California Edison Company <br />("SCE ") and the Customer or the Customer's Authorized Agent, as Identified an page 1 above (each deemed an <br />"Applicant" for purposes of this Agreement). Applicant agrees to review these terms and conditions. Any <br />Implementation of a project hereunder will be deemed to be acceptance by the Applicant of such termd and <br />conditions, and such terms and conditions shall be binding on the Applicant (both Customer and Authorized Agent, <br />If applicable), If these terms and conditions are not acceptable to Applicant, then Applicant must notify SCE and <br />refrain from any implementation of the project, otherwise will proceed at their own risk. SCE and Applicant may be <br />individually referred to as a "Party" and collectively as the "Parties." <br />1.0 PROJECT DESCRIPTION This Agreement Is limited to those projects and/or solutions described in the <br />applicable 2010 -2012 Energy Management Solutions - incentive Application for Business Customers (together with <br />all forms attached thereto; and referred to herein as the "Application "). As stated in the Application, SCE shall pay <br />incentives to Applicant, or such other party properly authorized to receive payment, in accordance with the terms <br />and conditions of this Agreement. The Customized Solutions Program ('Program"] is further described In the 2090 <br />Customized Statewide Procedures Manual for Business ( "Prograrn Manual ") and at <br />www.sce.comlcustomized solutions. <br />2.0 DOCUMENTS INCORPORATED BY REFERENCE The following documents are hereby Incorporated by <br />reference and made part of this Agreement: (1) Applicant's completed, signed and submitted Application, (11) SCE <br />acceptance ietter(s) based on the energy saving solutions proposed in the Applicatlon, and (Iii) the agreement (or. <br />memorandum of understanding, as applicable) to jointly deliver the 2010 -12 Energy Efficiency Partnership Program <br />applicable to the Parties (the "Partnership Agreement"), <br />3.0 ELIGIBILITY Program funding is limited and is available on a first -come, first - served basis. Funds will be <br />reserved only upon both SCE's written approval of the Application and SCE's execution of this Agreement. Projects <br />must meet the following requirements to be eligible for payment of Program Incentives ("Incentive(s) "): (1) Project <br />site must be a nonresidential facility located within SCE's service territory; (2) SCE Customers must pay the Public <br />Goods Charge ("PGC ") on the SCE electric meter where the energy efficient equipment Is Installed; (3) Projects will <br />be evaluated using the Calculated Approach and/or the Measured Savings Approach (also known as measurement <br />and vwfflcation ("M &V"); (4) Energy savings and demand reduction resulting from the project must be above and <br />beyond baseline energy performance, which include state- mandated codes, federal- mandated codes, <br />industry- accepted performance standards or other baseline energy performance standards as determined by SCE; <br />(5) Projects must meet all other Program requirements, terms and conditions; (6) Applicant certifies that Applicant <br />will not apply far or receive rebates, incentives, or services. covered by this Agreement in an amount greater than <br />the total cost of the project or soiuiion(s) (including labor and materials); and (7) The Applicant certifies that the <br />solutions covered by this Agreement have not and will not receive any funds from any other utility, state or local <br />program funded by the PGC surcharge. <br />4.0 SUBMITTAL REQUIREMENTS FOR PAYMENT Applicant shall submit to SCE the documents described <br />below-prior to being .ellgible_for payment-of Incentives.. Required-documents..lnclude, <br />Agreement, fully executed and with the attached documents referenced in Item 2.0 above; (2) Complete <br />engtneering calculations to demonstrate energy savings and documentation, if applicable (including archival <br />diskette, CD, etc_); (3) Schematic drawings and /or manufacturer specification sheets, If applicable; (4) Invoices <br />andlordocumentation to support solution costs, at SCE's request; (5) Project Installation Report; (6) Operating <br />Report, IF MW is required; and (7) Any other documents related to the project, project site, solutions, energy <br />savings or otherwise requested by SCE In Its sole discretion, in connection with the Program. <br />5.0 I SPECTIONS Applicant is solely responsible fdr ensuring that SCE has reasonable access for all <br />inspections, Including but not limited to: (1) Pre - installation equipment Inspection to exams a the existinglbaseline <br />equipment and to check the accuracy of Applicants equipment survey; (2) Post Installatiod'equipment Inspection to <br />check installed equipment and to verify accuracy of Applicants equipment survey; (3) Post-operation Inspection to <br />verify energy savings of the solutions after Installed equipment has been operating, if requested by SCE; and (4) <br />Inspection for any other Program - related reason that SCE, in its sole discretion, deems necessary. <br />6.0 REVIEW AND DISCLAIMER SCE'S ANDIOR ITS CONSULTANTS' REVIEW OF THE DESIGN, <br />CONSTRUCTION, OPERATION OR MAINTENANCE OF THE PROJECT OR ENERGY EFFICIENCY <br />SOLUTIONS SHALL NOT CONSTITUTE ANY REPRESENTATION AS TO THE ECONOMIC OR TECHNICAL <br />