My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SOUTHERN CALIFORNIA EDISON (7)
Clerk
>
Contracts / Agreements
>
S
>
SOUTHERN CALIFORNIA EDISON (7)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2017 2:25:39 PM
Creation date
6/6/2012 11:14:50 AM
Metadata
Fields
Template:
Contracts
Company Name
SOUTHERN CALIFORNIA EDISON
Contract #
A-2011-203
Agency
PUBLIC WORKS
Council Approval Date
8/24/2011
Destruction Year
0
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
283
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
.FEASIBILITY, OPERATIONAL CAPABILITY, OR RELIABILITY OF THE PRO.dCT OR SOLUTIONS, NOR SHALL <br />THE APPLICANT, IN ANYWAY, MAKE SUCH A REPRESENTATION TO A THIRD PARTY. APPLICANT IS <br />SOLELY RESPONSIBLE FOR THE ECONOMIC AND TECHNICAL FEASIBILITY, CONSTRUCTION, <br />OPERATIONAL CAPABILITY AND RELIABILITY OF APPLICANT'S PROJECT AND SOLUTIONS. SCE MAKES <br />NO WARRANTY, WHETHER STATUTORY, EXPRESS OR IMPLIED, INCLUDING, WITHOUT LIMITATION, THE <br />IMPLIED WARRANTIES OF MERCHANTABILITY AND FITNESS FOR ANY PARTICULAR PURPOSE, USE OR <br />APPLICATION. <br />7.0 PAYMENTS Payment of incentives will be made only after all Program requirements are met by Applicant to <br />SCE's sole satisfaction..Payment of. Incentives will be made as designated by Customer in Section 8 of the <br />Application. <br />7.1 SCE retains sole discretion to determine the appropriate baseline values and energy savings <br />calculations used to determine Incentive payments. Incentives shall only be paid on projects that exceed <br />the basdline perfwmance standards applicable when this Agreement Is signed. SCE reserves the right to <br />modify or cancel the incentive amount if the actual solution installed differs from the installation as set forth <br />in this Agreement. <br />7.2 The total Incentive payment under the Calculated Savings Approach or Measured Savings Approach <br />shall not exceed the total Incentive in' the Final Approved Savings Estimate (as presented on Page 2 of this <br />Agreement). However, projects may (at the discretion of SCE) be eligible for Incentive payments in excess <br />of the Final Approved Savings Estimate if the project results In: (a) Increased actual energy savings <br />resulting from the Installation of a greater quantity of the approved solutions (as outlined in SCE's <br />acceptance letter); (b) Increased actual energy savings resulting from greater efficiencies than estimated <br />(as outlined In the SCE acceptance letter); and/or (c) greater actual project costs than originally <br />estimated. <br />Partnership Incentive levels and incentive caps shall apply according to the terms of the applicable <br />Partnership Agreement. The total Incentive payment shall not exceed the total project cost as defined <br />the Program Manual. <br />7.3 Energy savings for which Incentives are paid cannot exceed the actual electric usage for each SCE <br />Customer service account for which incentives are being requested. Non -SCE supply, such as <br />cogeneration or deliveries from another commodity supplier, does not qualify as usage from SCE (with the <br />exception of Direct Access customers or customers paying departing load fees for which SCE collects <br />PGC surcharges). <br />7.4 SCE will make the applicable Incentive payment to the designated payee, in one or more installments, <br />only after all required and/or requested documents have been submitted to, and approved by; SCE, and <br />the appropriate Inspection(s) of the project or project site have been completed In accordance with the <br />Program rules set forth In the Program Manual, <br />7.5 Except as provided below, all projects and /or solutions must be completely Installed and fully <br />operational one year Pram SCE's written project Application approval date to be eligible for Incentive <br />_payments. SCE reserves the right to cease making Incentive payment sj, require the return of the total or <br />prorated Incentive payments, and /or terminate this Agreement if the project is not completely Installed and <br />fully operational by the applicable date as Indicated above, unless an installation extension Is granted by <br />SCE. <br />8.0 PAYMENT DISQUALIFICATION IFICATION Any Incentives received by Applicant shall be repaid to SCE, in whole or in <br />part, as follows: <br />8.1 If Customer fails to pay the PGC surcharge throughout the Term of this Agreement. In this event, the <br />total estimated amount of the incentives shall be prorated and any incentive payment shall be based on <br />the energy savings that occur during the payment of the PGC surcharge. <br />8.2 If (1) Customer does not provide SCE with 100% of the related energy benefits specified in this <br />Agreement for the life of the product or for a period of five (5) years from receipt of the Incentive, <br />whichever is less, or (2) the energy benefit to SCE ceases In any way, including but not limited to <br />Customer and/or the project site ceasing to receive electricity from SCE, the solution, equipment and /or <br />project ceasing to function, or Customer ceasing the use of the equipment, solution or project site, <br />
The URL can be used to link to this page
Your browser does not support the video tag.