My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
VISTA DEL VERDE LANDSCAPE, INC. 3 - 2012
Clerk
>
Contracts / Agreements
>
V
>
VISTA DEL VERDE LANDSCAPE, INC. 3 - 2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/20/2022 4:16:36 PM
Creation date
9/26/2012 9:27:31 AM
Metadata
Fields
Template:
Contracts
Company Name
VISTA DEL VERDE LANDSCAPE, INC.
Contract #
A-2012-113
Agency
PARKS, RECREATION, & COMMUNITY SERVICES
Council Approval Date
6/4/2012
Expiration Date
6/1/2013
Destruction Year
2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The Contractor shall protect City and/or private property adjacent to work areas <br />including sprinkler systems, drain pipes, lawns, brick work, plantings, masonry <br />work, fences, walls, sidewalks, street paving, etc., located on either public or private <br />property. Contractor shall, at its expense, replace any property that is removed or <br />damaged, other than property pre -approved for removal. <br />Contractor shall abide by the City's "Policy for Driving on Park Property" (See <br />Attachment 6). <br />H. TRAFFIC CONTROL <br />The Contractor will not interrupt traffic flow on City streets. In situations where it is <br />necessary to restrict traffic flow, the Contractor will contact the appropriate City <br />department and obtain all necessary permits and/or consent from the responsible <br />public agency. <br />MONTHLY REPORTS <br />Prior to the first day of each month the Contractor shall submit the following reports: <br />1) employees daily work schedule by location and crew/task(s); 2) pesticide use <br />report that was forwarded to the Agricultural Commissioner's Office; 3) irrigation <br />report; and, 4) "green waste" recycling report. <br />J. WATER COST <br />City will pay for water used by Contractor pursuant to this agreement up to a <br />specified amount detailed in a monthly Estimated Applied Water (EAW) report. <br />Should the amount of water applied exceed the monthly EAW then the Contractor <br />shall pay the cost of the excess water. <br />I1. GROUNDS/LANDSCAPE MAINTENANCE SPECIFICATIONS <br />A. DEFINITIONS <br />1. "Director" shall mean the Executive Director of Parks, Recreation and <br />Community Services or designated representative. <br />2. "Pruning" shall mean the practice of removing lateral shrub or tree branches and <br />may also be referred to as "trimming." <br />3. "Weed" shall mean any undesirable or misplaced plant. <br />B. SCOPE OF WORK <br />It is the intent of this agreement to continually improve the quality of the facilities. <br />The Contractor shall provide all labor, training, materials, tools, equipment, <br />transportation, hauling, dumping, fertilizers, pesticides, chemicals and other items <br />needed to perform high quality grounds/landscape maintenance pursuant to the terms <br />defined herein. The Contractor shall provide all grounds/landscape maintenance at <br />work sites listed herein, including, but not limited to pruning/trimming, shaping and <br />training of trees, shrubs, and ground cover plants, removing and controlling weeds, <br />controlling plant diseases and pests; mowing turf, edging turf and ground cover; <br />10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.