Laserfiche WebLink
12. Sport Court Maintenance <br />a) All sport courts shall be blown off weekly. Courts and fence lines shall <br />be completely free of dirt, debris, etc. <br />b) All tennis courts shall be washed down every other week to remove dust, <br />gum and stains. The courts shall have water removed immediately <br />following the washing down. <br />c) All basketball and volleyball courts shall be washed down monthly to <br />remove dust, gum and stains. The courts shall have water removed <br />immediately following the washing down. <br />d) Contractor shall replace tennis and basketball nets when they become <br />worn. The City shall furnish nets. <br />13. General Maintenance and Clean -Up For All Parks and Contracted Sites <br />a) All trash and debris on the ground or in trash receptacles shall be <br />removed from all worksites each day Monday through Sunday before <br />12:00 p.m. This includes all parking lots, landscape areas, paved areas, <br />street curb gutters, flood control channels, etc. Trash shall consist of all <br />items 80 lbs. or less. All trash receptacles and lids shall be wiped clean <br />continuously as stains appear. <br />b) The contractor shall rake, hand remove, or vacuum leaves that are <br />not absorbed by planting. This shall be done as often as required to <br />maintain a neat appearance. <br />c) After heavy windstorms or other inclement weather that impacts sites <br />under this agreement, the Contractor shall bring in extra staff to clean all <br />parks areas within two (2) days at no cost to the City. Debris (80 lbs. or <br />less), such as but not limited to, litter, fallen branches, trash, limbs, <br />branches, soil erosion, etc., shall be removed from the worksites. <br />d) The Contractor shall keep sidewalks and all other paved areas swept <br />and free of any debris, dirt, glass, weeds, leaves, etc. at all times. <br />e) Drain inlets shall be checked and if necessary cleaned once per day <br />to avoid flooding of areas during inclement weather. <br />14. Other Requirements <br />a) Work Not Scheduled <br />The Director may delete a portion of or the entire work site from <br />contractual maintenance during a construction period or any period <br />where the Director determines that work cannot be scheduled. The <br />deletion of this portion of work will be reflected as a reduction in the <br />monthly payment to the Contractor. The amount of reduction will be <br />based on the percentage of area involved and will be determined by the <br />City. <br />28 <br />