Laserfiche WebLink
15. Special Maintenance <br />In addition to the standard Grounds -Landscape Specification the following <br />special maintenance shall be performed. <br />a) P.E. Bike Trail (Chestnut to Bristol). In addition to the standard <br />Grounds -Landscape Specification the following special maintenance <br />shall be performed. <br />(1) Adams to Bristol — The contractor shall keep the unimproved <br />areas immediately adjacent the improved bike trail free of <br />weeds, debris, and otherwise any objectionable item a <br />minimum of 4' from fence lines and/or to the wall of <br />adjacent buildings. <br />(2) Warner Ave. to Occidental — The unimproved land <br />immediately adjacent (east) of the improved bike trail is a <br />part of this agreement. The Contractor shall maintain all <br />plant material and keep unimproved areas free of weeds, <br />trash and debris. <br />(3) Flower west toward Bristol - This portion of the bike trail <br />has an unimproved portion of property from Flower St. <br />running west along the bike trail. This property shall <br />continuously be maintained free of weeds, trash and debris. <br />16. Ci . Inspection <br />a) The Director or his designated representative shall regularly inspect <br />the parks, playgrounds, fields and all other City property subject to this <br />Agreement. If said inspection results in discovery of work that is not <br />performed in the manner, and to the professional degree set forth in the <br />Specifications, Contractor agrees that the City shall deduct from <br />Contractor's next monthly payment, the City's actual or estimated cost of <br />performing the work to bring the property into conformance with the <br />specifications. Additionally, City shall impose liquidated damages of up <br />to $300.00 per inspection, per park, per day not meeting the <br />specifications during any such inspection. <br />29 <br />