My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
VISTA DEL VERDE LANDSCAPE, INC. 3 - 2012
Clerk
>
Contracts / Agreements
>
V
>
VISTA DEL VERDE LANDSCAPE, INC. 3 - 2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/20/2022 4:16:36 PM
Creation date
9/26/2012 9:27:31 AM
Metadata
Fields
Template:
Contracts
Company Name
VISTA DEL VERDE LANDSCAPE, INC.
Contract #
A-2012-113
Agency
PARKS, RECREATION, & COMMUNITY SERVICES
Council Approval Date
6/4/2012
Expiration Date
6/1/2013
Destruction Year
2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
9.1 To maintain levelness of all fields, contractor shall, once every two months, <br />scarify drag built up amounts of materials at high spots and cut and level drag the <br />scarified material to low spots. The Contractor shall fill any remaining low spots <br />with new Gail Materials "Pro Gold with Stabilizer" brickdust from stock and <br />make level. <br />Note: Staff shall identify areas to scarify/cut and level <br />drag to the contractor at weekly meetings with <br />contractors appointed site supervisor (as per <br />section 6.2 of contract). <br />9.2 Heavy water scarified and cut and leveled areas to a '/z" min. depth and allow <br />settling in before play on field. <br />Note: Due to heavy watering and its need to settle <br />before play, staff shall provide a schedule of bi- <br />monthly scarify/cut and level drag dates to <br />contractor. <br />10.0 Work to be Completed "ANNUALLY" <br />10.1 Each year, the following renovation is to be done on all fields in conjunction with <br />the City's Annual Sports Turf Renovation Schedule. Fields renovated may <br />change from year to year. <br />10.1.1 Contractor shall laser grade each ball diamond. Contractor shall <br />scarify drag built up amounts of materials at high spots and cut <br />and level drag the scarified material to low spots. The <br />Contractor shall fill any remaining low spots with new Gail <br />Materials "Pro Gold with Stabilizer" brickdust from stock and <br />make level. <br />Note: Staff shall identify areas to scarify/cut and level <br />drag at the November meeting with contractor's <br />owner (as per section 6.3 of contract). <br />10.1.2 Contractor shall verify all base distances, pitching rubber <br />distances and pitching mound heights per the Little League, <br />Pony/Colt League specifications for each specific field. <br />Contractor shall repair any specifications not being met on any <br />field. <br />10.1.3 In addition, contractor shall install 1 /2" new Gail Materials "Pro - <br />gold with Stabilizer" (brickdust) to in -fields at all diamonds <br />(minimum 26 tons per Girls Softball/Major Little League Field <br />and minimum 40 tons per Junior/Senior Little League Field). <br />Also, the contractor shall install a minimum of 1 ton of Turface <br />calcite clay per Girls Softball/Major Little League Field and 2 <br />tons of Turface calcite clay to Junior/Senior Little League Fields <br />36 <br />
The URL can be used to link to this page
Your browser does not support the video tag.