My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
VISTA DEL VERDE LANDSCAPE, INC. 3 - 2012
Clerk
>
Contracts / Agreements
>
V
>
VISTA DEL VERDE LANDSCAPE, INC. 3 - 2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/20/2022 4:16:36 PM
Creation date
9/26/2012 9:27:31 AM
Metadata
Fields
Template:
Contracts
Company Name
VISTA DEL VERDE LANDSCAPE, INC.
Contract #
A-2012-113
Agency
PARKS, RECREATION, & COMMUNITY SERVICES
Council Approval Date
6/4/2012
Expiration Date
6/1/2013
Destruction Year
2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Responsibility for and purchase of necessary materials shall be at <br />contractor's expense. <br />Note: The City has the right to move brickdust and <br />Turface materials to other infields under this <br />agreement should they decide that an infield or <br />infields do not require additional materials a <br />particular year. <br />11.0 Work To Be Completed "AS DIRECTED" <br />11.1 Replace Base ANCHORS as directed. <br />Note: City of Santa Ana use's the Roger's Breakaway <br />base anchoring system. Contractor shall install <br />base anchors into the ground per manufacturer's <br />standards. Top of stake shall be approximately <br />2" below the surface grade so that the base sits <br />level and flush against the surface on all sides. <br />11.2 Replace Bases as directed. <br />Note: City of Santa Ana shall be responsible for <br />supplying all necessary base anchors and/or <br />bases to the contractor as needed. <br />11.3 Replace or Remove/Level/Re-Install home plates as directed. <br />11.4 Replace or Remove/Level/Re-Install pitching rubbers as directed. <br />Note: City of Santa Ana shall be responsible for <br />supplying all necessary home plates and/or <br />pitching rubbers to the contractor as needed. <br />11.5 When given direction to complete "as directed" work, contractor shall complete <br />the directed work on the next working day. <br />12.0 Infield Turf Maintenance <br />12.1 Infield turf shall mean all sport turf in the infield, the foul territory of the infield <br />and 36" beyond the infield brickdust skin line/arc. Infield turf shall be mowed <br />two (2) times per week on Monday and Friday. <br />12.1.1 <br />Contractor shall use a "greens" reel mower to provide "putting <br />green" quality finish cut. <br />12.1.2 <br />Infield turf shall be cut between ''/2" and 1/4" per staffs direction. <br />12.1.3 <br />All turf clippings shall be collected and disposed of. <br />12.1.4 <br />Edging of infield are shall be performed by infield sub. <br />37 <br />
The URL can be used to link to this page
Your browser does not support the video tag.