My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
VISTA DEL VERDE LANDSCAPE, INC. 3 - 2012
Clerk
>
Contracts / Agreements
>
V
>
VISTA DEL VERDE LANDSCAPE, INC. 3 - 2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/20/2022 4:16:36 PM
Creation date
9/26/2012 9:27:31 AM
Metadata
Fields
Template:
Contracts
Company Name
VISTA DEL VERDE LANDSCAPE, INC.
Contract #
A-2012-113
Agency
PARKS, RECREATION, & COMMUNITY SERVICES
Council Approval Date
6/4/2012
Expiration Date
6/1/2013
Destruction Year
2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
If the SAPRF representative requests or directs the Contractor to perform work in a given <br />area, it will be the Contractor's responsibility to verify and locate any underground <br />systems (i.e. utility lines) and take responsibility for taking reasonable precaution when <br />working in these areas. <br />Contractor shall call Underground Alert (800) 4224133) at least two working days prior <br />to digging for line locations. Any damage or problems shall be reported immediately to <br />the SAPRF representative and the City of Santa Ana. If the Contractor discovers <br />something unexpected or a unique problem occurs, he should stop work and immediately <br />contact an authorized SAPRF representative for a timely resolution of the problem. <br />2.03 CONTRACTOR'S STAFF <br />The Contractor shall provide sufficient personnel to perform all work in accordance with <br />the specifications set forth herein. A qualified, English speaking supervisor in the <br />employ of the Contractor shall supervise all of the Contractor's personnel. The <br />supervisor shall be available at all times to the SAPRF representative during work <br />operations. The responsibility for all work performed will remain with the full-time <br />certified arborist. <br />The Contractor shall furnish the necessary competent and key personnel to properly <br />supervise and direct the work of fully equipped, competent and experienced crews as well <br />as all safety equipment, including but not limited to, all equipment and work procedures <br />required by ANSI Z133.1-1994. The Contractor shall secure all timekeeping, <br />bookkeeping and other necessary clerical and office work required in the performance of <br />the contract. <br />The Contractor shall be responsible for the supervision of all of his crews. He shall <br />check all of his crews regularly for proper quantity and quality of work, proper <br />maintenance of tools and equipment, and safety. <br />2.04 SUBSTITUTIONS <br />Whenever a specific type of material is specified, no substitutions shall be allowed <br />without written consent of the SAPRF representative. <br />2.05 CERTIFICATION OF MATERIALS <br />All materials shall be delivered on the site in original containers. Materials shall be <br />subject to inspection by the ARMD representative. The SAPRF representative will not <br />approve materials not meeting the SAPRF standards, and Contractor shall return any such <br />non -satisfactory items at his/her cost. <br />2.06 CONTRACTOR NEGLECT <br />Any damage to the City of Santa Ana, SAPRF, or private property, which has been <br />determined to be due to the Contractor's neglect, shall be corrected at no additional cost <br />to the City of Santa Ana or the SAPRF. <br />2.07 HOURS OF OPERATION <br />The Contractor shall perform all work between the hours of 7:00 a.m. and 4:00 p.m., <br />Monday through Friday. No work shall be performed on weekends or on City recognized <br />holidays without written SAPRF approval. <br />2.08 SPECIFICATIONS AND PLANS <br />48 <br />
The URL can be used to link to this page
Your browser does not support the video tag.