My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
VISTA DEL VERDE LANDSCAPE, INC. 3 - 2012
Clerk
>
Contracts / Agreements
>
V
>
VISTA DEL VERDE LANDSCAPE, INC. 3 - 2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/20/2022 4:16:36 PM
Creation date
9/26/2012 9:27:31 AM
Metadata
Fields
Template:
Contracts
Company Name
VISTA DEL VERDE LANDSCAPE, INC.
Contract #
A-2012-113
Agency
PARKS, RECREATION, & COMMUNITY SERVICES
Council Approval Date
6/4/2012
Expiration Date
6/1/2013
Destruction Year
2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The work performed shall be done in accordance with the Standard Specifications for <br />Public Works Construction, latest edition, hereinafter referred to as Standard <br />Specifications. In case of conflict between the Standard Specifications and this <br />Specification, this Specification shall take precedence over and be used in lieu of such <br />conflicting portions. <br />Where the plans or specifications describe portions of work in general terms, but not <br />complete detail, it is understood that workmanship of the finest quality is to be used. <br />Unless otherwise specified, the Contractor shall furnish all labor, materials, tools, <br />equipment and incidentals and do all the work involved in executing the contract. <br />2.09 CONSTRUCTION EQUIPMENT <br />The Contractor shall take all necessary precautions for safe operation of his equipment <br />and the protection of the public from injury and damage from such equipment. <br />2.10 SOUND CONTROL REQUIREMENTS <br />The Contractor shall comply with all local sound control and noise level rules, <br />regulations and ordinances that apply to any work performed pursuant to the Contract. <br />Each internal combustion engine used for any purpose on the job or related to the job <br />shall be equipped with a muffler of a type recommended by the manufacturer of such <br />equipment. No internal combustion engine shall be operated on the project without said <br />muffler. Full compensation for conforming to the requirements of this section shall be <br />considered as included in the prices paid for the various contract items of work involved <br />and no additional compensation will be allowed therefore. Sounds, such as loud music, <br />that are not related to the project, shall be kept at levels so as to not disturb the general <br />public. <br />2.11 TRAFFIC CONTROL <br />The Contractor shall notify the SAPRF representative of intent to begin the contract work <br />at least five (5) days before work is begun. The Contractor shall cooperate with local <br />authorities relative to handling traffic through the areas and shall make arrangements <br />relative to keeping the working area safe and clear of vehicles. <br />When entering or leaving roadways carrying public traffic, the Contractor's equipment, <br />whether empty or loaded, shall in all cases yield to public traffic. All traffic delineation <br />and work area protection shall conform to the Work Area Traffic Control Handbook <br />(W.A.T.C.H.) 2000 Edition. <br />The Contractor shall make every effort to keep commercial driveways open during <br />working hours. Should this not be possible, Contractor shall coordinate with the property <br />owners affected to insure that designated times of ingress and egress is available. After <br />working hours, all driveways shall be accessible with smooth and safe crossings through <br />any construction area (State of California Traffic Manual). <br />2.12 INQUIRIES AND COMPLAINTS <br />The Contractor shall maintain an office at some fixed place and shall maintain a <br />telephone thereat, listed in the telephone directory in his own name or in the firm name <br />by which he is most commonly known. Furthermore, the Contractor shall, at all times, <br />have some responsible person(s), employed by the Contractor, to take the necessary <br />&J, <br />
The URL can be used to link to this page
Your browser does not support the video tag.