My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25D - AGMT - ON-CALL ENVIRONMENTAL SRVS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2013
>
01/07/2013
>
25D - AGMT - ON-CALL ENVIRONMENTAL SRVS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/22/2013 12:21:19 PM
Creation date
1/3/2013 11:39:38 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25D
Date
1/7/2013
Destruction Year
2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
°?lar Environmental Consulting Services <br />completed the management duties for an Infrastructure Needs Assessment Study for the Villages at <br />Market Creek Community Planning Area, a redevelopment project located in South East San Diego. <br />Duties included the identification of community infrastructure needs for transportation and utilities <br />with their associated anticipated costs and thresholds. Some of Mr. Hammond's relevant Orange County <br />experience includes: Moody Street Beautification-Enhancement, Cypress, CA; WQMP Plan Checking - <br />Cypress, CA; Westminster Boulevard Landscape Median Enhancement, Westminster, CA; and Residential <br />Street Rehabilitation, Westminster, CA. <br />Project Team Availability <br />Our team has sufficient members to provide timely environmental consulting services for City of Santa <br />Ana. As Program Manager, Gene Anderson will assign resources to critical projects to ensure timely <br />completion. The table below provides our availability percentages for project team members. <br />F <br />GeneAnderson Program Manager/CEQA/NEPA Environmental <br />Documents 70% <br />Paula Fell, MS Deputy Program Manager/Environmental Planning 75% <br />Craig Neslage, QEP, MBA Associate 70% <br />Mike McEntee Associate 70% <br />Linette Lina Biology 50% <br />Wayne Bischoff, PhD Cultural 35% <br />Charles Cisneros, MS, RPA Cultural 60% <br />Vincent Ip, PE, GE Geological/Soil Study 35% <br />Meredith Church, PG Hazardous Materials 30% <br />Wayne Brown Public Outreach 40% <br />Brad Jensen Public Outreach 40% <br />Larry Hail, PE, TE, PTOE Traffic Studies 35% <br />Scott Patton, PE, QSD, QSP FAA & ALUC <br />Requirements/Utility/Sewer/Hydrology/Water Quality 35% <br />Joe Hammond, PE, QSD, QSP Utility/Sewer/Preliminary Engineering 35% <br />Scope of Services <br />This section of the_ proposal addresses Chambers Group's Project Teams; approach to providing the <br />services described in Exhibit A (Scope of Services) of the RFP. Types of City projects that may require <br />CEQA and NEPA documentation; traffic, sewer, and water engineering; or regulatory permit services <br />include: <br />9 Neighborhood street repair <br />0 Arterial widening <br />a Corridor traffic signal synchronization <br />A Fixed Guideway <br />e Sewer main infrastructure hotspot <br />repairs and relining and rehabilitation <br />Pump stations <br />e Water mains <br />Bikeway/park <br />The staff selected to perform the work outlined in the RFP have work experience on projects within an <br />urban type of environment. To highlight selected, Chambers Group has provided an organization chart <br />on page 11 in this proposal. <br />`tF rr,,y <br />CHAMBERS <br />17 <br />25D-58
The URL can be used to link to this page
Your browser does not support the video tag.