My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL PACKET_2013-01-22
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2013
>
01/22/2013
>
FULL PACKET_2013-01-22
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/22/2013 11:38:36 AM
Creation date
1/17/2013 5:19:07 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Date
1/22/2013
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
350
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COOPERATIVE AGREEMENT NO. C-2-1992 <br />1 F. To prepare a "Before and After Study" for the PROJECT. As described in the Measure <br />2 M2 Eligibility Guidelines adopted by the AUTHORITY, the "Before and After Study" for the project is <br />3 considered the equivalent of the required Project Final Report (Measure M2 Ordinance No. 3, Section <br />4 8.111.9) for the project. The AUTHORITY shall provide the "Before and After Study" to the <br />5 PARTICIPATING AGENCIES in draft and final formats for comment and comments shall be noted in <br />6 the final study. <br />7 G. To provide Ongoing Monitoring and Maintenance of optimized signal timing after <br />8 Primary Implementation of the PROJECT is completed and continue until the end of the three year <br />9 grant period. <br />10 ARTICLE 5. RESPONIBILITES OF THE PARTICIPATING AGENCIES <br />11 The PARTICIPATING AGENCIES agree to the following responsibilities for implementation <br />12 and funding of the PROJECT: <br />13 A. Provide a technical representative to meet and participate as a member of the <br />14 PROJECT's Traffic Forum. <br />15 B. To authorize the AUTHORITY to manage, procure, and implement all aspects of the <br />16 PROJECT. <br />17 C. To participate and support the PROJECT implementation within the timeframe <br />18 outlined in the APPLICATION and consistent with the CTFP Guidelines adopted by the <br />19 AUTHORITY. <br />20 D. To provide the AUTHORITY all current intersection, local field master, and or central <br />21 control system timing plans and related data upon request. <br />22 E. To provide the local match and or documentation for the in-kind services for the <br />23 PROJECT in accordance with Attachment B. Failure to provide included match and or evidence of <br />24 in-kind service may result in the loss of future participation for competitive funds. <br />25 F. PARTICIPATING AGENCIES that have included a dollar match as identified in <br />26 Attachment B shall provide payment for the dollar match to the AUTHORITY within 30 calendar days <br />Page 6 of 15 <br />25D-8
The URL can be used to link to this page
Your browser does not support the video tag.