My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL PACKET_2013-01-22
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2013
>
01/22/2013
>
FULL PACKET_2013-01-22
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/22/2013 11:38:36 AM
Creation date
1/17/2013 5:19:07 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Date
1/22/2013
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
350
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COOPERATIVE AGREEMENT NO. C-2-2030 <br />1 considered the equivalent of the required Project Final Report (Measure M2 Ordinance No. 3, Section <br />2 13.111.9) for the project. The AUTHORITY shall provide the "Before and After Study" to the <br />3 PARTICIPATING AGENCIES in draft and final formats for comment and comments shall be noted in <br />4 the final study. <br />5 G. To provide Ongoing Monitoring and Maintenance of optimized signal timing after <br />6 Primary Implementation of the PROJECT is completed and continue until the end of the three year <br />7 grant period. <br />8 ARTICLE 5. RESPONIBILITES OF THE PARTICIPATING AGENCIES <br />9 The PARTICIPATING AGENCIES agree to the following responsibilities for implementation <br />10 and funding of the PROJECT: <br />11 II A. Provide a technical representative to meet and participate as a member of the <br />12 11 PROJECT's Traffic Forum. <br />13 11 B. To authorize the AUTHORITY to manage, procure, and implement all aspects of the <br />14 II PROJECT. <br />15 C. To participate and support the PROJECT implementation within the timeframe <br />16 outlined in the APPLICATION and consistent with the CTFP Guidelines adopted by the <br />17 AUTHORITY. <br />18 D. To provide the AUTHORITY all current intersection, local field master, and or central <br />19 control system timing plans and related data upon request. <br />20 E. To provide the local match and or documentation for the in-kind services for the <br />21 PROJECT in accordance with Attachment B. Failure to provide included match and or evidence of <br />22 in-kind service may result in the loss of future participation for competitive funds. , <br />23 F. PARTICIPATING AGENCIES that have included a dollar match as identified in <br />24 Attachment B shall provide payment for the dollar match to the AUTHORITY within 30 calendar days of <br />25 receipt of an invoice. <br />26 / <br />Z§,PZ§Q
The URL can be used to link to this page
Your browser does not support the video tag.