My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ALL AMERICAN ASPHALT (BRISTOL STREET WIDENING FROM 2ND ST. TO 10TH ST.)
Clerk
>
Contracts / Agreements
>
PROJECTS
>
ALL AMERICAN ASPHALT (BRISTOL STREET WIDENING FROM 2ND ST. TO 10TH ST.)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/9/2024 5:45:50 PM
Creation date
2/5/2013 8:44:36 AM
Metadata
Fields
Template:
Contracts
Company Name
ALL AMERICAN ASPHALT (BRISTOL STREET WIDENING FROM 2ND ST. TO 10TH ST.)
Contract #
Various
Agency
Public Works
Council Approval Date
1/22/2013
Destruction Year
2018
Notes
Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0" -C'7. Mina <br />To: <br />From: <br />Subject: <br />David Cavazos <br />City Manager <br />Fred Mousavipour, Executive Director <br />Public Works Agency <br />Date: September 24, 2014 <br />Project Nos. 08 -1700, 12 -6421, 12 -6422 <br />Bristol Street Widening From 2 "d Street to 10th Street; <br />Change Order No. 6 <br />CONTRACTOR All American Asphalt <br />PO Box 2229 <br />Corona, CA 92878 <br />PROJECT DESCRIPTION: 08 -1700; Bristol Street Widening from 2nd Street To 10th Street, <br />12- 6421;Bristol Street Water Main Improvements from 3rd Street to 10th <br />Street, 12 -6422; Bristol Street Sewer Main Improvements from 3rd <br />Street to 10th Street. Residential Concrete Street Repair <br />CHANGE ORDER NUMBER: 6 <br />ACCOUNTING UNIT - ACCOUNT- ACTIVITY NUMBER: <br />JUSTIFICATION <br />EXTRA WORK AT AGREED PRICES <br />CHANGE ORDER AMOUNT: $ 65, 492.24 <br />05917661 - 66220 - 08170001028 <br />03217662- 66220 - 08170002028 <br />03017660 - 6622_0- 08170003028 <br />05617640- 66220 - 12642201028 <br />06617647 - 66220 - 12642101028 <br />05817661 - 66220 - 14682201028 <br />After the specified 25' Phoenix dactylifera palm trees were planted, Southern <br />California Edison requested that two trees be relocated due to potential future <br />conflicts with overhead power lines. This price includes all costs to including crane <br />costs, traffic control, irrigation repair, and landscaping restoration. (PCO #39) <br />AGREED PRICE $12,469.40 <br />2. The plans indicated the proposed sound wall located on east side of Bristol n/o 6th <br />Street to be 108 LF, after the wall was constructed it was determined that there was a <br />four foot gap between the end of the wall and the existing boundary wall. This change <br />order will extend the sound wall 4 LF to join the existing wall. This price accounts for <br />all costs including excavation, disposal and construction of the foundation and wall. <br />(PCO #41) <br />AGREED PRICE $4,969.40 <br />
The URL can be used to link to this page
Your browser does not support the video tag.