My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL PACKET_2013-06-17
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2013
>
06/17/2013
>
FULL PACKET_2013-06-17
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/6/2017 4:24:04 PM
Creation date
6/17/2013 1:06:19 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Date
6/17/2013
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
580
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
street light locations and service points is attached to this proposal (EXHIBIT ). <br />Funding will be allocated over a three -year period until the work is completed. <br />The Contractor shall provide at his own risk and cost all labor, materials, tools, <br />equipment, traffic control and miscellaneous devices, transportation, hauling, dumping, <br />and recycling of construction and demolition material as part of this project. <br />II. FUNCTIONS AND RESPONSIBILITIES <br />A. DIRECTOR <br />The Director shall have the authority to accept/reject materials, workmanship and to <br />make minor changes in work or schedule. When the performance of the work or <br />completion per schedule is determined to be sub - standard, he may (1) recommend <br />that all or a portion of payment be withheld, and/or forfeiture for delay be assessed; <br />(2) direct the work be accomplished by a separate contractor, in order to complete <br />the necessary work as close to schedule as possible, and withhold the resulting <br />costs. Payment to be withheld shall be deducted from the next monthly payment <br />due the Contractor, or if the amount is insufficient to cover payment, the Contractor <br />shall be liable and will be billed accordingly. <br />The Director, or his authorized representative shall decide all questions, which <br />may arise as to the manner of performance and completion per schedule, <br />acceptable fulfillment of the contract by the Contractor, interpretation of the <br />specifications, and compensation to include completion of work by alternate <br />sources. <br />B. CONTRACTOR <br />(1) Local Office <br />The Contractor shall maintain a local office with a competent <br />representative who can be reached during normal working hours and <br />authorized to discuss matters pertaining to this contract with the Director. <br />A local office is one that can be reached by telephone without it being a <br />toll call. Contractor will not be allowed to store equipment or materials at <br />any contracted area. <br />(2) Submittals <br />The Contractor shall submit to the Director at the beginning of work, 1) a <br />detailed job schedule, 2) time sheet, 3) names and titles of all persons <br />working on the project, and 4) materials to be used on the project for <br />approval. All submittals shall be periodically updated as necessary. The <br />Director shall be immediately notified of any deviation from schedule or <br />material usage. <br />14 <br />19C -16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.