Laserfiche WebLink
MAYOR <br />Miguel A. Pulldo <br />MAYOR PRO TEM <br />Sal Tinajaro <br />COUNCILMEMBERS <br />Vincent F. Sarmiento <br />Michele Martinez <br />Angelic.@ Amezoua <br />P. David Benevides <br />Raman A. Reyna <br />June 25, 2013 <br />ADDENDUM No. ONE <br />CITY OF SANTA ANA <br />PUBLIC WORKS AGENCY M36 <br />20 Civic Center Plaza • P.O. Box 1988 <br />Santa Ana, California 92702 <br />INTERIM CITY MANAGER <br />Kevin O'Rourke <br />CITY ATTORNEY <br />Sonia R. Carvalho <br />CLERK OF THE COUNCIL <br />Maria D,Huizar <br />SUBJECT: PROJECT NOS. 11-6743,116415: BROADWAY REHABILITATION - <br />CIVIC CENTER DRIVE TO SANTA CLARA AVENUE AND BROADWAY <br />AND WASHINGTON AVENUE WATER MAIN IMPROVEMENTS <br />The following changes have been made to Specifications for the subject project: <br />Specifications <br />1. Pages BP 1 to 5: Replace with the attached pages BP 1 to 5. Changed the type <br />of bicycle loop to type D, added extra loops. <br />2. Page 29, section 2.22 Loop Defectors and Detector Lead -In Cable: Add the <br />following after paragraph 4: <br />Bicycle loop detectors in vehicle lanes shall be Type D circular 6 foot diameter. <br />3. Page 39, section 4.02 Project Phasing and Lane Requirements: Replace with <br />the attached section 4.02. <br />4. Page 16, CEMENT APPLICATION, paragraph 2: Replace with the following: <br />The cement content shall be 6% (six -percent) based on the dry unit weight of the <br />pulverized material. The dry unit weight of the pulverized material shall be <br />determined by California Test 312 (Design and Testing of Classes A and B <br />Cement Treated bases). The Engineer may order an increase or decrease in the <br />specified cement content when conditions warrant such action. For cost estimate <br />purposes, use 130 pounds/cubic foot for the dry unit weight of pulverized <br />material. <br />All other terms and conditions remain the same, <br />FOR THE CITY-� ;AA�ITA ANA <br />S- J <br />Edwin "William" Gale" P.E. <br />City Engineer <br />