My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CHRISTENSEN BROTHERS GENERAL ENGINEERING, INC. (1)
Clerk
>
Contracts / Agreements
>
PROJECTS
>
Completed Projects
>
CHRISTENSEN BROTHERS GENERAL ENGINEERING, INC. (1)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/14/2024 3:00:13 PM
Creation date
8/29/2013 7:50:41 AM
Metadata
Fields
Template:
Contracts
Company Name
CHRISTENSEN BROTHERS GENERAL ENGINEERING, INC.
Contract #
Various
Agency
Public Works
Council Approval Date
8/5/2013
Expiration Date
11/14/2014
Notes
Project
Document Relationships
CHRISTENSEN BROTHERS GENERAL ENGINEERING, INC. (2)
(Amended By)
Path:
\Contracts / Agreements\ PROJECTS
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROJ. NO. 116743,116415 <br />ADDENDUM NO. ONE <br />4.02 PROJECT PHASING AND LANE REQUIREMENTS <br />All Intersection work shall be constructed on weekend or night. <br />Segment A between Santa Clara and STA 17 +20: <br />• Phase 1: All work on the west side including curb, gutter, sidewalk and bus pads. <br />Maintain two northbound through lanes at all times. <br />• Phase 11: All work on the east side including curb, gutter, sidewalk and bus pads. <br />Maintain two southbound through lanes at all times. <br />• Work shall be constructed on weekend or night. <br />Segment A between STA 17 +20 and Main Place Drive: <br />• Phase 1: All work on the west side including curb, gutter, sidewalk and bus pads. <br />Maintain two northbound through lanes at all times. <br />• Phase II: All work on the east side including curb, gutter, sidewalk and bus pads. <br />Maintain two southbound through lanes and one northbound through lane at all times. <br />Work shall be constructed on weekend or night. <br />Segment B between Civic Center and Santa Clara: <br />• Phase 1: All work on the west side including curb, gutter, sidewalk and bus pads. <br />Maintain two northbound through lanes at all times. <br />• Phase I1: All work on the east side including curb, gutter, sidewalk and bus pads. <br />Maintain two southbound through lanes at all times. <br />Traffic control plans are required for the above. <br />
The URL can be used to link to this page
Your browser does not support the video tag.