Laserfiche WebLink
PROJ. NO. 116743,116415 <br />ADDENDUM NO. ONE <br />4.02 PROJECT PHASING AND LANE REQUIREMENTS <br />All Intersection work shall be constructed on weekend or night. <br />Segment A between Santa Clara and STA 17 +20: <br />• Phase 1: All work on the west side including curb, gutter, sidewalk and bus pads. <br />Maintain two northbound through lanes at all times. <br />• Phase 11: All work on the east side including curb, gutter, sidewalk and bus pads. <br />Maintain two southbound through lanes at all times. <br />• Work shall be constructed on weekend or night. <br />Segment A between STA 17 +20 and Main Place Drive: <br />• Phase 1: All work on the west side including curb, gutter, sidewalk and bus pads. <br />Maintain two northbound through lanes at all times. <br />• Phase II: All work on the east side including curb, gutter, sidewalk and bus pads. <br />Maintain two southbound through lanes and one northbound through lane at all times. <br />Work shall be constructed on weekend or night. <br />Segment B between Civic Center and Santa Clara: <br />• Phase 1: All work on the west side including curb, gutter, sidewalk and bus pads. <br />Maintain two northbound through lanes at all times. <br />• Phase I1: All work on the east side including curb, gutter, sidewalk and bus pads. <br />Maintain two southbound through lanes at all times. <br />Traffic control plans are required for the above. <br />