My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CHRISTENSEN BROTHERS GENERAL ENGINEERING, INC. (1)
Clerk
>
Contracts / Agreements
>
PROJECTS
>
Completed Projects
>
CHRISTENSEN BROTHERS GENERAL ENGINEERING, INC. (1)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/14/2024 3:00:13 PM
Creation date
8/29/2013 7:50:41 AM
Metadata
Fields
Template:
Contracts
Company Name
CHRISTENSEN BROTHERS GENERAL ENGINEERING, INC.
Contract #
Various
Agency
Public Works
Council Approval Date
8/5/2013
Expiration Date
11/14/2014
Notes
Project
Document Relationships
CHRISTENSEN BROTHERS GENERAL ENGINEERING, INC. (2)
(Amended By)
Path:
\Contracts / Agreements\ PROJECTS
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROJ. NO. 116743,116415 <br />ADDENDUM NO. TWO <br />4.02 PROJECT PHASING AND LANE REQUIREMENTS <br />All Major Intersection work shall be constructed on weekend or night. <br />• Broadway at Civic Center Drive, 10"' Street, Halesworth, Washington Avenue, 17t" Street <br />and Santa Clara Avenue. <br />Segment A between Santa Clara and STA 77 +20: <br />• Phase I: All work on the west side including curb, gutter, and sidewalk. Maintain two <br />northbound through lanes at all times. Work shall be constructed on weekend or night. <br />• Phase II: All work on the east side including curb, gutter, and sidewalk. Maintain two <br />southbound through lanes at all times. <br />Segment B between STA 89+30 and Main Place Drive: <br />• Phase I: All work on the west side including curb, gutter, and sidewalk. Maintain two <br />northbound through lanes at all tunes. <br />• Phase II: All work on the east side including curb, gutter, and sidewalk. Maintain two <br />southbound through lanes and one northbound through lane at all times. Work shall be <br />constructed on weekend or night. <br />Segment C between Civic Center and Santa Clara (midblock): <br />• Phase I: All work on the west side including curb, gutter, and sidewalk. Maintain two <br />northbound tlu-ough lanes at all times. <br />• Phase II: All work on the east side including curb, gutter, and sidewalk. Maintain two <br />southbound through lanes at all times. <br />Broadway and Washington Water Main Improvements project: <br />• Maintain at least one lane in each direction on Broadway from Civic Center to Santa <br />Clara Avenue. <br />• Washington from Flower Street to Broadway can be done per WATCH. <br />Traffic control plans are required for the above. <br />
The URL can be used to link to this page
Your browser does not support the video tag.