My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CHRISTENSEN BROTHERS GENERAL ENGINEERING, INC. (1)
Clerk
>
Contracts / Agreements
>
PROJECTS
>
Completed Projects
>
CHRISTENSEN BROTHERS GENERAL ENGINEERING, INC. (1)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/14/2024 3:00:13 PM
Creation date
8/29/2013 7:50:41 AM
Metadata
Fields
Template:
Contracts
Company Name
CHRISTENSEN BROTHERS GENERAL ENGINEERING, INC.
Contract #
Various
Agency
Public Works
Council Approval Date
8/5/2013
Expiration Date
11/14/2014
Notes
Project
Document Relationships
CHRISTENSEN BROTHERS GENERAL ENGINEERING, INC. (2)
(Amended By)
Path:
\Contracts / Agreements\ PROJECTS
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MAYOR <br />Miguel A. Pulido <br />MAYOR PRO TEM <br />Sal TinaJero <br />COUNCILMEMBERS <br />Vincent F. Sarmiento <br />Michele Martinez <br />Angelica Amezcua <br />P. David Benavides <br />Roman A. Reyna <br />July 2, 2013 <br />ADDENDUM No. TWO <br />CITY OF SANTA ANA <br />PUBLIC WORKS AGENCY M36 <br />20 Civic Center Plaza . P.O. Box 1988 <br />Santa Ana, Carfomia 92702 <br />INTERIM CITY MANAGER <br />Kevin O'Rourke <br />CITY ATTORNEY <br />Sonia R. Carvalho <br />CLERK OF THE COUNCIL <br />Maria D.Huizar <br />SUBJECT: PROJECT NOS. 11-6743,116415: BROADWAY REHABILITATION - <br />CIVIC CENTER DRIVE TO SANTA CLARA AVENUE AND BROADWAY <br />AND WASHINGTON AVENUE WATER MAIN IMPROVEMENTS <br />The following changes and clarifications have been made to Specifications for the <br />subject project: <br />Specifications <br />1. Page iv, Notice Inviting Bids, paragraph 1. Replace with the following: <br />NOTICE IS HEREBY GIVEN that the City of Santa Ana, California will receive at <br />City Hall -Ross Annex, (M-22), 20 Civic Center Plaza, Santa Ana, California <br />92701, the Public Works Agency Third Floor Receptionist, (see attached <br />map), on or before the hour of 2:00 p.m. on Monday, July 8"', 2013 <br />2. Page 39, section 4.02 Project Phasing and Lane Requirements: Replace with <br />the attached section 4.02, <br />Clarifications <br />The night and weekend work shall be established at the time of construction <br />based on the need of the businesses and residents. <br />2. The shift will be 8 hours and shall be established at the time of construction <br />based on the need of the businesses and residents. <br />3. The contract working days are per Specifications, section 1.14. <br />4. The work phasing and lane requirements shall be established at the time of <br />construction based on the need of the businesses and residents. Working days <br />and hours are per Section 1.14. <br />All other terms and conditions remain the same. <br />FOR THE CITYOF-SANTA ANA <br />City Engineer <br />
The URL can be used to link to this page
Your browser does not support the video tag.