My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CHRISTENSEN BROTHERS GENERAL ENGINEERING, INC. (1)
Clerk
>
Contracts / Agreements
>
PROJECTS
>
Completed Projects
>
CHRISTENSEN BROTHERS GENERAL ENGINEERING, INC. (1)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/14/2024 3:00:13 PM
Creation date
8/29/2013 7:50:41 AM
Metadata
Fields
Template:
Contracts
Company Name
CHRISTENSEN BROTHERS GENERAL ENGINEERING, INC.
Contract #
Various
Agency
Public Works
Council Approval Date
8/5/2013
Expiration Date
11/14/2014
Notes
Project
Document Relationships
CHRISTENSEN BROTHERS GENERAL ENGINEERING, INC. (2)
(Amended By)
Path:
\Contracts / Agreements\ PROJECTS
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MEMORANDUM <br />TO: <br />David Cavazos <br />City Manager <br />Edwin "William" Galvez <br />Interim Executive Director <br />From: Public Works Agency <br />Date: Mav 16, 2014 <br />Project No. 116743 and 116415 <br />Broadway Rehabilitation and Water Main Improvements <br />Subject: Change Order No. 2 <br />Contractor: Christensen Brothers General Engineering, Inc. <br />21288 Papago Road <br />Apple Valley, CA 92307 <br />Project Description: Roadway and Water Main Line Improvements <br />Change Order Number: 2 Change Order Total: $494,383.04 <br />Accounting Unit -Account -Activity Number: 11674303028-03017660 <br />11674304028-05917663 <br />11674305028-03217662 <br />11641501028-06617647 <br />JUSTIFICATION <br />Extra Work at Time and Material <br />While potholing the water main and services on Broadway, several utility conflicts <br />were encountered. The water main at STA 14+60, 24+25 and 10+50 (17th Street) <br />was redirected from the original alignment to avoid irremovable obstructions, <br />including an existing stormdrains and active water lines (cylinder main). Also, <br />various unforeseen obstructions were found, which needed to be removed. During <br />the installation process, existing buried concrete pavement was encountered. The <br />material was more difficult to remove then originally proposed and required <br />additional saw cutting or breaking prior to removal. The export of the spoils was <br />hauled to a different plant for further processing and disposal. Additional import <br />material (sand and aggregate base) was needed to fill the void. Other <br />miscellaneous repairs include unmarked sewer laterals, water services and traffic <br />signal conduit. <br />The change order provides compensation for delays associated with production <br />loss. A prior approval was granted on January 6, 2014. <br />(PC0#26;27,28,30,31,32,35,36,37,38,39,40,45,46,48,49,51,54,56,57,58,59,60,61,63,66,67,68,69,70, <br />72,74,76,77,78 &79). <br />FINAL COST $307,487.98 <br />
The URL can be used to link to this page
Your browser does not support the video tag.