My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CHRISTENSEN BROTHERS GENERAL ENGINEERING, INC. (1)
Clerk
>
Contracts / Agreements
>
PROJECTS
>
Completed Projects
>
CHRISTENSEN BROTHERS GENERAL ENGINEERING, INC. (1)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/14/2024 3:00:13 PM
Creation date
8/29/2013 7:50:41 AM
Metadata
Fields
Template:
Contracts
Company Name
CHRISTENSEN BROTHERS GENERAL ENGINEERING, INC.
Contract #
Various
Agency
Public Works
Council Approval Date
8/5/2013
Expiration Date
11/14/2014
Notes
Project
Document Relationships
CHRISTENSEN BROTHERS GENERAL ENGINEERING, INC. (2)
(Amended By)
Path:
\Contracts / Agreements\ PROJECTS
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MEMORANDUM <br />To: <br />From: <br />Subject: <br />David Cavazos <br />City Manager <br />Date: November 3, 2014 <br />Contractor: Christensen Brothers General Engineering, Inc. <br />21288 Papago Road <br />Apple Valley, CA 92307 <br />Project Description: Roadway and Water Main Line Improvements <br />Change Order Number: 3 Change Order Total: $68,915.47 <br />Accounting Unit -Account -Activity Number: <br />JUSTIFICATION <br />Extra Work at Agreed Price <br />11674303028-03017660 <br />11674304028-05917663 <br />11674305028-03217662 <br />11641501028-06617647 <br />1. While constructing the curb ramps at the NE and SE corners of 10th and Broadway the <br />existing pull boxes were discovered within the limits of the new curb ramps. Upon <br />further investigation, the conduits inside the pull boxes needed to be lowered to allow <br />for the new grade of the pull boxes. Therefore, it was recommended to lower the <br />conduits and adjust the existing pull boxes and pedestrian push buttons to <br />accommodate for the new grade of the curb ramp.(PCO 81) <br />AGREED PRICE $5,775.00 <br />2. While connecting the new water main to the existing water main at the intersection of <br />Washington and Broadway an old wye was discovered at the connection point. The <br />wye intercepted an abandoned main, which is no longer needed. Therefore, the City's <br />Water Department requested to have the wye removed and a new 14ā butterfly valve <br />installed (PCO 82) <br />AGREED PRICE $8,799.60 <br />3. While removing the existing pavement at Santa Clara and Broadway an unforeseen old <br />style traffic loop pressure plate was encountered. Consequently, the pressure plate <br />needed to be removed to achieve the design street section. (PCO 85) <br />AGREED PRICE $2,136.76 <br />Fred Mousavipour <br />Executive Director <br />Public Works Agency <br />^: <br />Q <br />Project No. 116743 and 116415 <br />Broadway Rehabilitation and Water Main Improvements <br />C) <br />Change Order No. 3 <br />;=cā, <br />Contractor: Christensen Brothers General Engineering, Inc. <br />21288 Papago Road <br />Apple Valley, CA 92307 <br />Project Description: Roadway and Water Main Line Improvements <br />Change Order Number: 3 Change Order Total: $68,915.47 <br />Accounting Unit -Account -Activity Number: <br />JUSTIFICATION <br />Extra Work at Agreed Price <br />11674303028-03017660 <br />11674304028-05917663 <br />11674305028-03217662 <br />11641501028-06617647 <br />1. While constructing the curb ramps at the NE and SE corners of 10th and Broadway the <br />existing pull boxes were discovered within the limits of the new curb ramps. Upon <br />further investigation, the conduits inside the pull boxes needed to be lowered to allow <br />for the new grade of the pull boxes. Therefore, it was recommended to lower the <br />conduits and adjust the existing pull boxes and pedestrian push buttons to <br />accommodate for the new grade of the curb ramp.(PCO 81) <br />AGREED PRICE $5,775.00 <br />2. While connecting the new water main to the existing water main at the intersection of <br />Washington and Broadway an old wye was discovered at the connection point. The <br />wye intercepted an abandoned main, which is no longer needed. Therefore, the City's <br />Water Department requested to have the wye removed and a new 14ā butterfly valve <br />installed (PCO 82) <br />AGREED PRICE $8,799.60 <br />3. While removing the existing pavement at Santa Clara and Broadway an unforeseen old <br />style traffic loop pressure plate was encountered. Consequently, the pressure plate <br />needed to be removed to achieve the design street section. (PCO 85) <br />AGREED PRICE $2,136.76 <br />
The URL can be used to link to this page
Your browser does not support the video tag.