Laserfiche WebLink
City of Santa Ana Environmental Checklist <br />Table 3-11. Project Consistency with the Santa Ana General Plan <br /> Consistency <br />Goal, Objective, or Policy Consistency Discussion Determination <br />Circulation Element <br />Goal 7 - Utilize alternative The project applicants have established a shared Consistent <br />parking strategies as a parking agreement with the SAUSD that allows for <br />means of managing the Bat Nha Meditation Center to utilize up to 55 <br />transportation demand. parking spots at the Alhambra Lincoln Elementary <br /> school on weekends. The proposed project would <br /> be consistent with Goat 7 of the Circulation <br /> Element by utilizing 55 spaces at the Lincoln <br /> Elementary School as an alternative parking <br /> strategy to manage parking and transportation <br /> demand. <br />Conservation Element <br />Policy- Minimize changes in The proposed project would be required to obtain Consistent <br />hydrology and pollutant a General Construction Permit to develop the <br />loading; require proposed project. A General Construction Permit <br />incorporation of control, addresses soil disturbance activities greater than <br />including structural and one acre and includes the development and <br />non-structural and Best Implementation ofa SWPPP, WQMP, and BMPs to <br />Management Practices to provide sediment and erosion control, waste <br />mitigate the projected handling measures, and non stormwater <br />increases In pollutant loads management. As such, the proposed project would <br />and flows. include BMPs to mitigate the projected increases in <br /> pollutant loads and flows, consistent with this <br /> policy and RWQCB requirements. <br />Policy - Ensure that post- The proposed project would result in an increase Consistent <br />development runoff rates in post-development runoff from the site and the <br />and velocities from a site City's DAMP and LIP would require <br />have no significant adverse implementation of a WQMP to incorporate source- <br />impact on downstream control BMPs. There are no streams or rivers <br />erosion and stream habitat. within or adjacent to the project site and no <br /> significant adverse impacts on downstream <br /> erosion or stream habitat are anticipated. The <br /> project would be consistent with this Dolicv. <br />Land Use Element <br />Goal 3 - Preserve and The proposed project would result in the Consistent <br />improve the character and redevelopment of an existing religious facility on a <br />integrity of neighborhoods. previously developed site that is within a <br />completely developed urban area and located <br />adjacent to two other existing religious facilities <br />(i.e., the New Spirit Baptist Church and the Lao <br />Evangelical Church). The proposed project would <br />result in inBll development that is consistent with <br />the objectives of the Low Residential LR-7 district <br />and the R-1 zoning district with the approval of a <br />CUP. The project is expected to improve the <br />character and integrity of the area, which is <br />consistent with this eoal. <br />The Bat Nha Buddhist Meditation Center 3-61 <br />Initial Study/Mitigated Negative Declaration <br />ICr 00215.12 <br />31C-114