My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
31C - CUP - 803 S SULLIVAN ST
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2013
>
09/16/2013
>
31C - CUP - 803 S SULLIVAN ST
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/16/2013 8:36:15 AM
Creation date
9/12/2013 4:38:02 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Planning & Building
Item #
31C
Date
9/16/2013
Destruction Year
2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
192
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Santa Ana Environmental Checklist <br /> Consistency <br />Goal, Objective, or Policy Consistency Discussion Determination <br />Goal 5 - Ensure that the The proposed project is subject to an evaluation of Consistent <br />impacts of development are potential impacts as required by State CEQA law, <br />mitigated. As the Lead Agency, the City of Santa Ana <br /> determined that a Mitigated Negative Declaration <br /> would be sufficient to ensure that the impacts of <br /> development are mitigated to a level below <br /> significance. A complete discussion of the project's <br /> potential impacts and mitigation measures are <br /> included within this MND document, which <br /> ensures that the impacts of the proposed <br /> development are mitigated through the proposed <br /> mitigation measures; therefore, the project would <br /> be consistent with this goal. <br />Policy 2.10 - Support new The project would result in the redevelopment of a Consistent <br />development which is parcel that would be similar to the existing <br />harmonious in scale and religious uses on the project site. Existing <br />character with existing development within the area includes religious, <br />development in the area, commercial, office, medical, and single- and multi- <br /> family residential uses. The New Spirit Baptist <br /> Church, which is a single-story building, is located <br /> adjacent to the project site to the north. The Lao <br /> Evangelical Church, located south and adjacent to <br /> the project site, is also a single-story building. To <br /> the east and west of the project site are a variety of <br /> single-family residential homes, and a <br /> development of two-story multi-family townhomes <br /> occurs west of the project site, across South <br /> Sullivan Street. Further south along West <br /> McFadden Avenue is a strip commercial center <br /> with auto-related uses and a variety of local- <br /> serving commercial uses. The development of the <br /> proposed project will consist of a new two-level <br /> meditation center on the 1.46-acre project site and <br /> will be harmonious in scale and character with <br /> existing surrounding development. Thus, the <br /> proposed project would be consistent with this <br /> policy. <br />Policy 3.5 - Encourage new The area and neighborhood surrounding the Consistent <br />development and/or project site includes various buildings that are <br />additions to existing older and do not represent a single unified <br />development that are architectural style or character. Similarly, the <br />compatible in scale, and existing meditation center site consists of various <br />consistent with the buildings developed over a 3S-year period that do <br />architectural style and not architecturally or stylistically identify with <br />character of the each other or with the surrounding neighborhood. <br />neighborhood. Redevelopment of the site would include a unified <br /> traditional Vietnamese style that would be <br /> integrated with the proposed landscaping and <br /> parking improvements, resulting in an <br /> improvement over existing conditions. The <br /> proposed project would result in the construction <br /> of a new two-story meditation center that is <br />The Bat Nha Buddhist Meditation Center 3-62 June 2013 <br />Initial Study/Mitigated Negative oeclaration Icf 002 15.11 <br />31C-115
The URL can be used to link to this page
Your browser does not support the video tag.