Laserfiche WebLink
City of Santa Ana <br />Environmental Checklist <br />Consistency <br />Goal, Objective, or Policy Consistency Discussion Determination <br />Seismic Safety Element <br />Goal 1 - Provide a safe As discussed in Sections VI of this document Consistent <br />environment for all Santa (Geology and Soils), the proposed project will be <br />Ana residents and workers. designed and approved in consistency with the <br /> CBC and site-specific design recommendations <br /> within the geotechnical investigation. The approval <br /> process, by the City of Santa Ana Planning and <br /> Building Agency includes confirmation that the <br /> proposed development fully complies with the <br /> CBC. Other potential safety concerns are addressed <br /> throughout this document, and sufficient <br /> mitigation measures are provided to ensure that <br /> no significant impacts occur as a result of the <br /> proposed project. As such, the project would <br /> provide a safe environment for all Santa Ana <br /> residents and workers, and the project would be <br /> consistent with this goal. <br />Objective 1.3 - Minimize Pursuant to requirements of the CBC, the City of Consistent <br />seismic risk in the Santa Ana, and Mitigation Measure GEO-1, the <br />construction of new proposed project would incorporate appropriate <br />structures. design measures to minimize the seismic risk <br /> related to seismic movement. The Incorporation of <br /> measures pursuant to these requirements would <br /> minimize seismic risk. The project would be <br /> consistent with this policy. <br />Urban Desian Element <br />Policy 1.1- New The proposed project would include modern Consistent <br />development and architectural elements that represent the highest <br />redevelopment projects quality design, materials, finishes, and <br />must have tile highest construction, consistent with this policy. See <br />quality design, materials, consistency determination for Policy 2.10 and <br />finishes, and construction. Policy 3.5 of the Land Use Element, above. <br />Policy 1.4 - Development The proposed project would be required to submit Consistent <br />and other design features a Security Plan to the Santa Ana Police Department <br />that prevent loitering, for approval and to comply with the CPTED <br />vandalism, graffiti, and principles to the satisfaction of the police <br />visual deprivation, are to be department. Therefore, the project is consistent <br />included in all projects. with this policy. <br />Policy 1.5 - Enhanced See consistency determination for Policy 2.10 and Consistent <br />architectural forms, textures, Policy 3.5 of the Land Use Element, above. <br />colors, and materials are <br />expected in the design of all <br />projects. <br />Goal 2 - Improve the See consistency determination for Policy 2.10 and Consistent <br />physical appearance of Policy 35 of tine Land Use Element, above. <br />districts through <br />development that is <br />proportional and <br />aesthetically related to its <br />district settine. <br />The Bat Nha Buddhist Meditation Center 3-65 June 2013 <br />Initial Study/Mitigated Negative Declaration ¢r 00215.12 <br />31 C-118