My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
31C - CUP - 803 S SULLIVAN ST
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2013
>
09/16/2013
>
31C - CUP - 803 S SULLIVAN ST
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/16/2013 8:36:15 AM
Creation date
9/12/2013 4:38:02 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Planning & Building
Item #
31C
Date
9/16/2013
Destruction Year
2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
192
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Santa Ana Environmental Checklist <br />Consistency <br />Goal, Objective, or Policy Consistency Discussion Determination <br />paints, solvents, oils, grease, and caulking. These <br />types of materials are not acutely hazardous, and <br />all storage, handling, use, and disposal of these <br />materials are regulated by federal and state <br />regulations, which construction activities are <br />required to comply with. Therefore, the project <br />would be consistent with this aolicv. <br />Public Safety Element <br />Policy - Assure minimum The proposed project is located about 2.66 miles Consistent <br />feasible response time to southwest of the SAPD headquarters, which would <br />police calls in all areas of the be the first responder to the site in the event of an <br />City. emergency. As discussed in Section XIV (Public <br /> Services), response times are expected to be 6 <br /> minutes 20 seconds from SAPD headquarters and <br /> the proposed project would not alter or delay <br /> existing response times to the project site. As such, <br /> minimum feasible response times for police would <br /> be assured upon implementation of the proposed <br /> project. <br />Policy- Assure minimum The proposed project is located about 0.56 miles Consistent <br />feasible response time to fire frmil OCFA Fire Station #73, which would first <br />calls in all areas of the City. respond to the site in the event of a fire emergency. <br />Strictly enforce safety Additionally, the site is approximately 1.48 miles <br />provisions of building and from Fire Station #77. The OCFA estimates that <br />zoning codes. response times to the site are 7 minutes and 20 <br /> seconds or less, which is considered adequate by <br /> the fire department. Furthermore, the OCFA <br /> requires the proposed project to meet all access, <br /> water, and fire protection systems per the CBC and <br /> Fire Code. Due to coordination with the OCFA, the <br /> existing response times from Stations #73 and #77 <br /> to the project site, as well as the enforcement of <br /> building code requirements, the project is <br /> consistent with this policy. <br />Policy - Assure acceptable As discussed in Section IX (Hydrology and Water Consistent <br />levels of risk to people and Quality), a NPDES General Construction permit and <br />property from flooding and a SWPPP would be required to address sediment <br />from toxic materials. control and flooding during construction activities. <br /> Stormwater flows are also not expected to be <br /> altered substantially and would not result in <br /> increased risks to people and property from <br /> flooding. Furthermore, as discussed in Section Vlll <br /> (Hazards and Hazardous Materials), Mitigation <br /> Measure HAZ-1 would ensure that any asbestos <br /> and lead-containing materials would be abated <br /> according to the California Hazardous Waste <br /> Control Law (CA Health and Safety Code, Division <br /> 20, Chapter 6.5), the Hazardous Waste Control <br /> Regulations (CA Code of Regulations, Title 22, <br /> Division 4,5), and SCAQMD requirements. <br />The Bat Nha Buddhist Meditation Center 3-64 June 2013 <br />Initial Study/Mitigated Negative Declaration ICF 00215.12 <br />31 C-117
The URL can be used to link to this page
Your browser does not support the video tag.