My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
31C - CUP - 803 S SULLIVAN ST
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2013
>
09/16/2013
>
31C - CUP - 803 S SULLIVAN ST
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/16/2013 8:36:15 AM
Creation date
9/12/2013 4:38:02 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Planning & Building
Item #
31C
Date
9/16/2013
Destruction Year
2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
192
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Santa Ana Environmental Checklist <br /> Less-than- <br /> Significant <br /> Potentially Impactwith Less-than- <br /> Significant Mitigation Significant No <br />XV11. Utilities and Service Systems Impact Incorporated Impact Impact <br />Would the project: <br />a. Exceed wastewater treatment requirements ? ? ® ? <br />of the applicable Regional Water Quality <br />Control Board? <br />b. Require or result in the construction of new ? ? ® ? <br />water or wastewater treatment facilities or <br />expansion of existing facilities, the <br />construction of which could cause significant <br />environmental effects? <br />C. Require or result in the construction of new ? ? ® ? <br />stormwater drainage facilities or expansion of <br />existing facilities, the construction of which <br />could cause significant environmental effects? <br />d. Have sufficient water supplies available to ? ? ® ? <br />serve the project from existing entitlements <br />and resources, or would new or expanded <br />entitlements be needed? <br />e. Result in a determination by the wastewater ? ? ® ? <br />treatment provider that serves or may serve <br />the project that it has adequate capacity to <br />serve the project's projected demand in <br />addition to the provider's existing <br />commitments? <br />E Be served by a landfill with sufficient ? ? ® ? <br />permitted capacity to accommodate the <br />project's solid waste disposal needs? <br />g. Comply with federal, state, and local statutes ? ? ® ? <br />and regulations related to solid waste? <br />Discussion <br />Would the project: <br />a. Exceed wastewater treatment requirements of the applicable Regional Water Quality Control <br />Board? <br />Less-than-Significant Impact, Wastewater generated is transported from the project site via an <br />existing Orange County Sanitation District (OCSD) trunk sewer line in South Sullivan Street. The <br />wastewater is transported through the OCSD trunk lines to be treated at the OCSD Reclamation <br />Plant No. 1, in the City of Fountain Valley. This wastewater treatment facility is currently undergoing <br />an expansion project, which will increase secondary treatment to a total design capacity of 180 <br />million gallons per day (mgd) (Orange County Sanitation District 2012). The new facilities at the <br />wastewater treatment plant include six aeration basins, six circular clarifiers, and a new blower <br />building. These ongoing improvements began in 2007 and are estimated to be completed prior to <br />commencement of the proposed project. <br />The Bat Nha Buddhist Meditation Center 3-89 lune 2013 <br />Initial Study/Mitigated Negative Declaration xE 00215.12 <br />31C-144
The URL can be used to link to this page
Your browser does not support the video tag.