My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
31C - CUP - 803 S SULLIVAN ST
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2013
>
09/16/2013
>
31C - CUP - 803 S SULLIVAN ST
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/16/2013 8:36:15 AM
Creation date
9/12/2013 4:38:02 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Planning & Building
Item #
31C
Date
9/16/2013
Destruction Year
2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
192
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Santa Ana <br />Environmental Checklist <br />Regarding California history or prehistory, the project site has not required substantial excavation <br />to develop the existing buildings on site and no documented studies or excavations have occurred <br />on the site. As such, the potential to discover unknown buried archaeological or paleontological <br />resources exists and therefore, potentially significant impacts on important examples of the major <br />periods of California history or prehistory exits. Impacts on archeological and paleontological <br />resources would be reduced to a less-than-significant level with the requirement that a qualified <br />professional archeologist and paleontologist (MM-CR-1 and MM-CR-2, respectively). With the <br />incorporation of the mitigation measures identified in Section V, Cultural Resources, impacts on <br />California history and prehistory would be reduced to a less-than-significant level. <br />b. Does the project have impacts that are Individually limited but cumulatively considerable? <br />("Cumulatively considerable" means that the incremental effects of a project are considerable <br />when viewed in connection with the effects ofpast projects, the effects of other current projects, <br />and the effects of probable future projects.) <br />Less-than-Significant Impact with Mitigation Incorporated. As described in the previous <br />sections of this environmental checklist, the proposed project would result in less than significant <br />direct impacts with mitigation measures on air quality, biological resources, geology and soils, noise, <br />and transportation and traffic. Implementation of mitigation measures identified in the <br />aforementioned resource areas of this document are required to reduce project impacts to a less- <br />than-significant level. <br />A cumulative impact could occur if the project would result in an incrementally considerable <br />contribution to a significant cumulative impact in consideration of past, present, and reasonably <br />foreseeable future projects for each resource area. The cumulative study area is confined to an <br />approximate two-mile radius from the project site, and includes the cumulative projects listed in <br />Table 3-26. Although for some resources, cumulative impacts are considered over a greater area, <br />and are addressed accordingly. <br />Table 3-26. Cumulative Projects List <br />No. Project Anticipated <br />Opening Year Description <br />1 Wintersburg Presbyterian Church 2012 Expansion of 24,348 sf church facilities <br />2 Torres Medical Office 2012 Construction of 6,000 sf medical office <br />3 Rite Aid/Walgreetls 2014 Construction of 15,836 sf retail building <br />4 Compassion Meditation Center 2014 Construction of 8,000 sf meditation center <br />5 The Academy Charter High School 2013 Construction of 146,136 sf residential <br /> high school for 450 students (including 80 <br /> residents) <br />6 Dayton Commercial Center 2012 Construction of 7,275 sf commercial <br />center <br />7 Downtown Artists' Lofts HI 2012 Construction of 16 artist live/work lofts <br />The following analysis evaluates the project's potential to contribute considerably to a cumulative <br />impact. <br />The proposed project would be required to implement all regional water quality permitting <br />procedures; would not result in any land use impacts, would not handle, dispose, or transport <br />The Bat Nha Buddhist Meditation Center June 2013 <br />Initial Study/Mitigated Negative Declaration 3-9g ICF 00715.12 <br />31 C-153
The URL can be used to link to this page
Your browser does not support the video tag.