My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
31C - CUP - 803 S SULLIVAN ST
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2013
>
09/16/2013
>
31C - CUP - 803 S SULLIVAN ST
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/16/2013 8:36:15 AM
Creation date
9/12/2013 4:38:02 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Planning & Building
Item #
31C
Date
9/16/2013
Destruction Year
2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
192
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Santa Ana <br />Transportation and Traffic <br />Environmental Checklist <br />The cumulative setting for transportation and traffic impacts includes all of the projects listed on <br />Table 3-26. The traffic generated from the cumulative projects is provided in Table 3-28. The traffic <br />cumulative analysis was prepared as part of the TIA (Appendix D), and includes the six intersections <br />analyzed for the proposed project. The traffic implications of past, present, and reasonably <br />foreseeable future projects include near- and future-term scenarios for the years 2014 and 2035, <br />respectively, and thresholds for impacts are determined in the same method as the project-level <br />analysis using ICU increase of 0.010 or greater at an intersection currently operating at LOS E or F. <br />Table 3.28. Cumulative Projects Traffic Generation Forecast <br /> <br />Related Project Description <br />Daily Sunday Peak Hour <br />Enter Exit Total <br />1. Wintersburg Presbyterian Church 331 20 16 36 <br />2. Torres Medical Office 9 2 1 3 <br />3. Rite Aid/Walgreens 1,396 62 62 124 <br />4. Compassion Meditation Center 408 25 20 44 <br />5. The Academy Charter High School 113 5 9 14 <br />6. Dayton Commercial Center 184 11 12 23 <br />7. Downtown Artists' Lofts 111 77 4 4 7 <br />Cumulative Projects Trips Generation 2,519 128 123 252 <br />1 Source: City of Costa Mesa (i.e., The Academy Charter High School <br />Transportation Impact Analysis prepared by Fehr & Peers, May 2012). <br />2 No daily trip rate is available for ITE Code 881 for Sunday so the average <br />weekday daily rate is used. <br />Source: (Appendix D). <br />Near-Term Cumulative Traffic Conditions - 2014 <br />Baseline traffic conditions in the near-term 2014 scenario are comprised of existing traffic <br />conditions, ambient growth, and traffic generated by the cumulative projects (listed in Table 3-26) <br />within the cumulative study area. As shown in Table 3-29, intersection operations would not exceed <br />the minimum acceptable LOS without or with the project in the year 2014. As a result, the proposed <br />project would not contribute to any cumulative impacts on intersections in the near-term 2014 <br />condition. <br />Table 3-29. Year 2014 Peak Hour Intersection Capacity Analysis <br />Minimum Without Project With Project Significant Impact <br />Acceptable <br />Key Intersection LOS V/Cl LOS V/Cl LOS Increase Yes/No <br />Fairview Street at First Street D 0.639 B 0.641 B 0.002 No <br />Sullivan Street at First Street <br />Fairview Street at Willits <br />Sullivan Street at Willits Street <br />Fairview Sweet at McFadden Avenue <br />The Bat Nha Buddhist Meditation center <br />Initial Study/Miligated Negative Declaration <br />D 0.475 A 0.489 A 0.014 No <br />D 0.443 A 0.463 A 0.020 No <br />D 0.349 A 0.374 A 0.025 No <br />D 0.684 B 0.691 B 0.007 No <br />3-105 June 2013 <br />ICE 00215.12 <br />31 C-161
The URL can be used to link to this page
Your browser does not support the video tag.