My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL PACKET_2013-09-16
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2013
>
09/16/2013
>
FULL PACKET_2013-09-16
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/6/2017 4:18:37 PM
Creation date
9/12/2013 6:53:51 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Date
9/16/2013
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
992
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CUP No. 2013 -26 and VA No. 2013 -09 <br />August 26, 2013 <br />Page 7 <br />• The granting of the variance will not be detrimental to the public or surrounding properties as <br />the building and site have been designed to comply with all applicable development standards <br />except for parking and height. The proposed off -site parking agreement with the SAUSD will <br />provide additional parking that exceeds the minimum required for the center. Further, off -site <br />improvements are required that address disabled accessibility issues from the school parking lot <br />to the site. The proposed roof elements will be consistent with the architectural theme and <br />materials found on similar projects in the City. The height and appearance of the roof elements <br />will blend with the existing buildings and will not be materially detrimental to the public welfare or <br />injurious to surrounding property. The taller roof elements will be setback substantially from <br />nearby properties and will not interfere with the safety of pedestrians or motorists entering or <br />exiting the site. <br />• Finally, the project will not adversely affect the general plan in any way as the land use <br />designation of Low Density Residential (IR -7) allows churches and accessory structures in the <br />land use designation. <br />Public Notification <br />The project site is located within the Bella Vista Neighborhood Association. Staff has attended <br />several meetings between the project applicants, the Bella Vista, New Horizons, Windsor Village <br />and Windsor Village North Neighborhood Associations, the Country Club Mobile Home Park, New <br />Spirit Baptist Church and the Lao Evangelical Church. The first meeting between the various <br />groups was held on December 7, 2011 and introduced the proposed meditation center to the <br />various parties. The most recent meeting between the groups was held on July 30, 2013. At <br />these meetings, numerous items of discussion were raised, including the need for better <br />cooperation between the three churches, parking during special events, traffic, noise and drainage. <br />The project site was posted with a notice advertising this public hearing, a notice was published in <br />the Orange County Reporter, and mailed notices were sent to all property owners and tenants <br />within 500 feet of the project site. At the time of this printing, no correspondence, by phone, <br />written, or electronic, has been received from any members of the public. <br />CEQA Compliance <br />As part of the City's permitting process, the proposed project is required to undergo an environmental <br />review in accordance with the California Environmental Quality Act (CEQA). In accordance with <br />CEQA, the recommended actions have been reviewed through a Mitigated Negative Declaration <br />(MND), Environmental Review No. 2012 -3, Section 15063 of the State CEQA Guidelines and <br />Sections 15070 -15075 of Article 6 guide the process for the preparation of a mitigated negative <br />declaration. <br />31 C -9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.