Laserfiche WebLink
CUP No. 2013 -26 and VA No. 2013 -09 <br />August 26, 2013 <br />Page 8 <br />This MND, as required by CEQA, contains: 1) a project description; 2) a description of the <br />environmental setting, potential environmental impacts, mitigation measures for any significant <br />effects, and consistency with plans and policies; and 3) names of preparers. The mitigation <br />measures included in this Initial Study /MND are designed to reduce or eliminate the potentially <br />significant environmental impacts described herein. The scope of the MND evaluates the proposed <br />project's effects on the following resource topics: <br />aesthetics <br />• agriculture and forestry resources <br />• air quality <br />• biological resources <br />cultural resources <br />geology /soils <br />greenhouse gas emissions <br />hazards & hazardous materials <br />• hydrology /water quality <br />land use /planning <br />mineral resources <br />noise <br />population /housing <br />public services <br />recreation <br />transportation /traffic <br />utilities/ service systems <br />The City prepared a draft MND and posted the Notice of Intent (NOI) to adopt an MND at the <br />Orange County Clerk's office; the NOI was published in the Orange County Register on July 17, <br />2013. The City circulated the draft MND for a 21 -day public review between July 17 and August 6, <br />2013. The draft MND was available for public review at the Santa Ana City Hall, the City of Santa <br />Ana Main Library, and on the City's website. <br />This final IS /MND contains the original draft IS /MND as published, as well as comments received on <br />the draft IS /MND and the responses of the lead agency to significant environmental points raised in <br />the review and consultation process. The intent of the final IS /MND is to provide a forum to air and <br />31 C -10 <br />