My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL PACKET_2013-09-16
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2013
>
09/16/2013
>
FULL PACKET_2013-09-16
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/6/2017 4:18:37 PM
Creation date
9/12/2013 6:53:51 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Date
9/16/2013
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
992
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Santa Ana Environmental Checklist <br />Consistency <br />Goal, Objective, or Policy Consistency Discussion Determination <br />paints, solvents, oils, grease, and caulking. These <br />types of materials are not acutely hazardous, and <br />all storage, handling, use, and disposal of these <br />materials are regulated by federal and state <br />regulations, which construction activities are <br />required to comply with. Therefore, the project <br />would be consistent with this aolicv. <br />Public Safety Element <br />As discussed in Section IX (Hydrology and Water Consistent <br />Policy - Assure minimum <br />The proposed project is located about 2.66 miles Consistent <br />feasible response time to <br />southwest of the SAPD headquarters, which would <br />police calls in all areas of the <br />be the first responder to the site in the event of an <br />City. <br />emergency. As discussed in Section XIV (Public <br />Services), response times are expected to be 6 <br />minutes 20 seconds from SAPD headquarters and <br />the proposed project would not alter or delay <br />existing response times to the project site. As such, <br />minimum feasible response times for police would <br />be assured upon implementation of the proposed <br />project. <br />Policy- Assure minimum <br />The proposed project is located about 0.56 miles Consistent <br />feasible response time to fire <br />fro» OCFA Fire Station #73, which would first <br />calls in all areas of the City. <br />respond to the site in the event of a fire emergency. <br />Strictly enforce safety <br />Additionally, the site is approximately 1.48 miles <br />provisions of building and <br />from Fire Station #77. The OCFA estimates that <br />zoning codes. <br />response times to the site are 7 minutes and 20 <br />seconds or less, which is considered adequate by <br />the fire department. Furthermore, the OCFA <br />requires the proposed project to meet all access, <br />water, and fire protection systems per the CBC and <br />Fire Code. Due to coordination with the OCFA, the <br />existing response times from Stations #73 and #77 <br />to the project site, as well as the enforcement of <br />building code requirements, the project is <br />consistent with this policy. <br />Policy - Assure acceptable <br />As discussed in Section IX (Hydrology and Water Consistent <br />levels of risk to people and <br />Quality), a NPDES General Construction permit and <br />property from flooding and <br />a SWPPP would be required to address sediment <br />from toxic materials. <br />control and Flooding during construction activities. <br />Stormwater Flows are also not expected to be <br />altered substantially and would not result in <br />increased risks to people and property from <br />Flooding. Furthermore, as discussed in Section Vlll <br />(Hazards and Hazardous Materials), Mitigation <br />Measure HAZ -1 would ensure that any asbestos <br />and lead- containing materials would be abated <br />according to the California Hazardous Waste <br />Control Law (CA Health and Safety Code, Division <br />20, Chapter 6.5), the Hazardous Waste Control <br />Regulations (CA Code of Regulations, Title 22, <br />Division 4,5), and SCAQMD requirements. <br />The Bat Nha Buddhist Meditation Center 3 64 June 2013 <br />Initial Study /Mitigated Negative Declaration ICF 00215.12 <br />31 C -117 <br />
The URL can be used to link to this page
Your browser does not support the video tag.