My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL PACKET_2013-09-16
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2013
>
09/16/2013
>
FULL PACKET_2013-09-16
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/6/2017 4:18:37 PM
Creation date
9/12/2013 6:53:51 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Date
9/16/2013
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
992
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Santa Ana <br />Environmental Checklist <br />Consistency <br />Goal, Objective, or Policy Consistency Discussion Determination <br />Seismic Safety Element <br />Goal 1 - Provide a safe <br />As discussed in Sections VI of this document Consistent <br />environment for all Santa <br />(Geology and Soils), the proposed project will be <br />Ana residents and workers. <br />designed and approved in consistency with the <br />must have tile highest <br />CBC and site - specific design recommendations <br />quality design, materials, <br />within the geotechnical investigation. The approval <br />finishes, and construction. <br />process, by the City of Santa Ana Planning and <br />Policy 1.4 - Development <br />Building Agency includes confirmation that the <br />and other design features <br />proposed development fully complies with the <br />that prevent loitering, <br />CBC. Other potential safety concerns are addressed <br />vandalism, graffiti, and <br />throughout this document, and sufficient <br />visual deprivation, are to be <br />mitigation measures are provided to ensure that <br />included in all projects. <br />no significant impacts occur as a result of the <br />Policy 1.5 - Enhanced <br />proposed project. As such, the project would <br />architectural forms, textures, <br />provide a safe environment for all Santa Ana <br />colors, and materials are <br />residents and workers, and the project would be <br />expected in the design of all <br />consistent with this goal. <br />Objective 1.3 - Minimize <br />Pursuant to requirements of the CBC, the City of Consistent <br />seismic risk in the <br />Santa Ana, and Mitigation Measure GEO -1, the <br />construction of new <br />proposed project would incorporate appropriate <br />structures. <br />design measures to minimize the seismic risk <br />development that is <br />related to seismic movement. The Incorporation of <br />proportional and <br />measures pursuant to these requirements would <br />aesthetically related to its <br />minimize seismic risk. The project would be <br />district settine. <br />consistent with this policy. <br />Urban Desian Element <br />Policy 1.1- New <br />The proposed project would include modern Consistent <br />development and <br />architectural elements that represent the highest <br />redevelopment projects <br />quality design, materials, finishes, and <br />must have tile highest <br />construction, consistent with this policy. See <br />quality design, materials, <br />consistency determination for Policy 2.10 and <br />finishes, and construction. <br />Policy 3.5 of the Land Use Element, above. <br />Policy 1.4 - Development <br />The proposed project would be required to submit Consistent <br />and other design features <br />a Security Plan to the Santa Ana Police Department <br />that prevent loitering, <br />for approval and to comply with the CPTED <br />vandalism, graffiti, and <br />principles to the satisfaction of the police <br />visual deprivation, are to be <br />department. Therefore, the project is consistent <br />included in all projects. <br />with this policy. <br />Policy 1.5 - Enhanced <br />See consistency determination for Policy 2.10 and Consistent <br />architectural forms, textures, <br />Policy 3.5 of the Land Use Element, above. <br />colors, and materials are <br />expected in the design of all <br />projects. <br />Goal 2 - Improve the <br />See consistency determination for Policy 2.10 and Consistent <br />physical appearance of <br />Policy 35 of tine Land Use Element, above. <br />districts through <br />development that is <br />proportional and <br />aesthetically related to its <br />district settine. <br />The Bat Nha Buddhist Meditation Center 3 -65 June 2013 <br />Initial Study /Mitigated Negative Declaration ¢r 00215.12 <br />31 C -118 <br />
The URL can be used to link to this page
Your browser does not support the video tag.