Laserfiche WebLink
Attachment 2 <br />Payment Schedule <br />City of Santa Ana <br />Hereinafter Referred to as CONTRACTOR <br />Contract Number M02014 <br />Cost Breakdown <br />CONTRACTOR shall be reimbursed according to the amounts stated above per vehicle <br />upon proof of vehicle delivery, vehicle acceptance, and placement of vehicle into <br />service. Documentation of the specific engine installed in the vehicle, including the <br />year, manufacturer, and model, must accompany each request for reimbursement. <br />Reimbursement for station will be made: <br />• only after verification of station completion. At a minimum, acceptable <br />verification shall consist of: <br />• Representative photos of completed station; <br />• a report signed by a responsible official certifying that the station has been <br />completed as described in Attachments 1 and 3; and <br />• invoice(s) from subcontractor(s) performing the installations, if any. <br />Reimbursement for EV charging stations will be made: <br />• only for site preparation construction, equipment purchase, and installation costs; <br />and <br />• only after verification of completion. At a minimum, acceptable verification shall <br />consist of: <br />• Representative photos of completed stations; <br />• a report signed by a responsible official certifying that the stations have been <br />completed as described in Attachments 1; and <br />• invoice(s) from subcontractor(s) performing the installations, if any. <br />55B -18 <br />Maximum <br />AB2766 CONTRACTOR <br />Purchase <br />Discretionary A132766 <br />i Other Funds <br />Total Cost <br />Category <br />1 Funds payable Subvention <br />Applied <br />I <br />under this Funds Applied <br />Contract <br />Heavy Duty <br />$270,000 (not to <br />CNG and <br />exceed $30,000 $155,000 <br />$250,000 <br />$675,000 <br />LPG <br />per vehicle) <br />Vehicles <br />Expand CNG <br />$46,000 $3,000 <br />$43,000 <br />$92,000 <br />station <br />__ <br />EV Charging <br />$68,000 $68,000 <br />$0 <br />$136,000 <br />Stations <br />Totals <br />_ <br />$384,000 $226,000 <br />$293,000 <br />$903,000 <br />CONTRACTOR shall be reimbursed according to the amounts stated above per vehicle <br />upon proof of vehicle delivery, vehicle acceptance, and placement of vehicle into <br />service. Documentation of the specific engine installed in the vehicle, including the <br />year, manufacturer, and model, must accompany each request for reimbursement. <br />Reimbursement for station will be made: <br />• only after verification of station completion. At a minimum, acceptable <br />verification shall consist of: <br />• Representative photos of completed station; <br />• a report signed by a responsible official certifying that the station has been <br />completed as described in Attachments 1 and 3; and <br />• invoice(s) from subcontractor(s) performing the installations, if any. <br />Reimbursement for EV charging stations will be made: <br />• only for site preparation construction, equipment purchase, and installation costs; <br />and <br />• only after verification of completion. At a minimum, acceptable verification shall <br />consist of: <br />• Representative photos of completed stations; <br />• a report signed by a responsible official certifying that the stations have been <br />completed as described in Attachments 1; and <br />• invoice(s) from subcontractor(s) performing the installations, if any. <br />55B -18 <br />