My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL PACKET_2013-09-16
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2013
>
09/16/2013
>
FULL PACKET_2013-09-16
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/6/2017 4:18:37 PM
Creation date
9/12/2013 6:53:51 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Date
9/16/2013
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
992
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Attachment 2 <br />Payment Schedule <br />City of Santa Ana <br />Hereinafter Referred to as CONTRACTOR <br />Contract Number ML12014 <br />If, at the completion of the Project, the expenditures are less than the Total Cost amount <br />above, the actual amount of AB 2766 Discretionary Funds reimbursed to <br />CONTRACTOR shall be adjusted on a prorated basis, as follows: <br />• For vehicles, the amount reimbursed to CONTRACTOR shall not exceed the <br />actual amount of AB 2766 Subvention and other funds applied, up to a maximum <br />of $30,000 per heavy -duty vehicle; and <br />• For the CNG station expansion and EV charging stations, the amount reimbursed <br />to CONTRACTOR shall not exceed the actual amount of AB 2766 Subvention <br />and other funds applied. <br />55B -19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.