Laserfiche WebLink
proper moisture content and <br />required degree of <br />compaction. Where less than <br />the required degree if <br />compaction indicated, <br />additional compactive effort <br />any necessary adjustments in <br />the moisture content of the <br />soil should be made to obtain <br />the required compaction. <br />To evaluate the presence of <br />During <br />Building/Planning <br />satisfactory materials at <br />Construction <br />Agency <br />design elevations, footing <br />excavations should be <br />observed to be clean of <br />loosened soil and debris <br />before placing steel or <br />concrete and probed for soft <br />areas. If soft or loose soils or <br />unsatisfactory materials are <br />encountered, these materials <br />should be removed and <br />replaced with compacted fill. <br />Wherever, in the opinion of a <br />During <br />Building/Planning <br />representative of T.E.L.A, as <br />Construction <br />Agency <br />unsatisfactory condition is <br />being created in any area, <br />whether by cutting or filling, <br />then the work should not <br />proceed in that area until the <br />condition has been corrected. <br />Prior to approval of final <br />Prior to <br />Building/Planning <br />design plans, the project <br />approval of <br />Agency <br />applicant shall submit the <br />final design <br />proposed project to the <br />plans <br />Orange County Airport Land <br />Use Commission for review <br />and consistency of FAA <br />criteria and regulations. <br />Prior to approval of final <br />Prior to <br />Building/Planning <br />design plans, the project <br />approval of <br />Agency <br />