My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
040405 Jt PH Cond Use, Develpo Agmt, Zoning, etc.-Geneva Commons Proj 200 E. First American Way
Clerk
>
Agenda Packets / Staff Reports
>
Successor Agency (Formerly the Community Redevelopment Agency) (1974-Present)
>
COMMUNITY REDEVLOPMENT AGENCY(1974-2012)
>
2000-2009
>
2005
>
04/04/05
>
040405 Jt PH Cond Use, Develpo Agmt, Zoning, etc.-Geneva Commons Proj 200 E. First American Way
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/5/2013 9:16:56 AM
Creation date
11/5/2013 9:12:09 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
220
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
applicant shall file a Notice <br />of Proposed Construction <br />with the FAA. Conditions <br />placed on the project by the <br />FAA shall be incorporated in <br />the final design and <br />construction of the proposed <br />proj ect. <br />final design <br />plans <br />Prior to the issuance of <br />Prior to <br />Public Works <br />grading permits, the project <br />Grading <br />Agency <br />applicant shall provide proof <br />Permits <br />of coverage under NPDES <br />General construction Activity <br />Storm Water Permit, which <br />includes a copy of the project <br />permit number and two <br />copies of the Storm Water <br />Pollution Prevention Plan. <br />Prior to the issuance of <br />Prior to <br />Public Works <br />grading permits, the project <br />Grading <br />Agency <br />applicant shall prepare an <br />Permits <br />NPDES post - construction <br />storm water management <br />plan per Orange County <br />Drainage Area Management <br />Plan (DAMP) that includes <br />all structural and non- <br />structural Best Management <br />Practices for the project. <br />a. Submit and have <br />approved a surface <br />drainage /utility plan to <br />include all structural Best <br />management Practices. <br />b. Provide two copies <br />of the Water Quality <br />Management Plan <br />(WQMP) that <br />includes a <br />description of all - <br />applicable <br />Structural and Non- <br />
The URL can be used to link to this page
Your browser does not support the video tag.