My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75A - PH 1901 East First St
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2013
>
11/18/2013
>
75A - PH 1901 East First St
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/15/2013 9:26:31 AM
Creation date
11/15/2013 9:01:16 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Planning & Building
Item #
75A
Date
11/18/2013
Destruction Year
2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
292
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
13io /agical Resources <br />The Proposed Project will not result in any new or changed impacts to biological resources <br />compared to the approved Project. The project site is developed and there are no native biological <br />resources on the property. The vegetation that exists on the site includes introduced non- native <br />urban plant species and will not be impacted by its removal to construct the Proposed Project As <br />with die approved Project, the Proposed Project will not have any biological resource impacts. The <br />Proposed Project is consistent with the analysis in the March 19, 2007 EIR. <br />Cml/wal Resonzes <br />The Proposed Project will not result in any new or changed impacts to cultural of paleontological <br />resources compared to the approved Project. The project site is developed and there are no known <br />cultural or paleontological resources on the property. Mitigation measures associated with the <br />approved Project are in place to protect any cultural or paleontological resources that may be <br />uncovered during project construction. T "he Proposed Project will not have any cultural resource <br />impacts. The Proposed Project is consistent with the analysis in the March '19, 2007 EIR. <br />Geology nud Soils <br />The Proposed Project would not result in any new or increased geology* or soil impacts compared to <br />the approved Project. Like the approved Project, the Proposed Project would be exposed to <br />potential liquefaction. And like the Project, the incorporation of the same applicable mitigation <br />measures to mitigate potential seismic event, liquefaction and soil erosion impacts will be applicable <br />to the Proposed Project. The Proposed Project will not have any new or added geological and soils <br />impacts compared to the approved Project. The Proposed Project is consistent with the analysis <br />and mitigation measures in the A4atch 19, 2007 EIR. <br />G7renboaae Gas Emissions <br />Because a greenhouse gas emission analysis was not required by CEQA at the time of the approval <br />of the Project, a greenhouse gas analysis was conducted for the Proposed Project, A copy of the <br />greenhouse gas analysis is attached as Appendix B. Based on the greenhouse gas analysis, the <br />Proposed Project will not have any significant greenhouse gas impacts and no mitigation measures <br />are recommended. <br />Hazards nud HaZat dow Maleials <br />The Proposed Project will not result in any significant hazards or hazardous material impacts. The <br />potential hazards and hazardous materials of the approved Project will be the some for the Proposed <br />Project. The Proposed Project will not result in any new or increased hazards compared to those <br />identified with the Project. The Proposed Project is consistent with the analysis and mitigation <br />measures in the March 19, 2007 EIR, <br />1901 East First Street— Addendum <br />August 14, 2013 <br />75A -104 <br />Page 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.