My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HOUSTON HARRIS & PCS, INC. 4 -2013
Clerk
>
Contracts / Agreements
>
H
>
HOUSTON HARRIS & PCS, INC. 4 -2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2014 11:39:27 AM
Creation date
1/28/2014 10:58:12 AM
Metadata
Fields
Template:
Contracts
Company Name
HOUSTON HARRIS & PCS, INC.
Contract #
A-2013-110
Agency
PUBLIC WORKS
Council Approval Date
7/15/2013
Expiration Date
6/30/2014
Destruction Year
2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
j <br />a <br />1 <br />J <br />J <br />J <br />J <br />J, <br />J <br />Implementation flan <br />Every line inspected is checked for quality, accuracy and confirms all contract requirements <br />are met. <br />Data inserted in the database is checked for accuracy, compared to the City's Map and to <br />an Excel Spreadsheet, supplied by the City, which includes all line segments for the entire <br />sewer system. During this process we check the wash logs ensuring they match the sewer <br />lines inspected that particular day. Once all data is verified to be correct the QC process <br />begins. <br />Our QC tech views each video in its entirety first checking for proper lighting and centering <br />of the camera. The video must have a clear picture, free of any kind of distortion or <br />interferences and the audio must be clear and concise. Every line must also begin with a <br />view of the open manhole proceeding uninterrupted in the downstream direction with the <br />insertion of the camera into the manhole. <br />All sewer lines are inspected using NASSCO's standard coding system. During the QC <br />process all lines are checked for the proper logging of each defect. All defects must be <br />accurately coded using the proper NASSCO code, o -clock position(s) and footage. The <br />inspection shall include location of all laterals, cracks, roots, deposits, infiltration, ex- filtration <br />and other conditions pertaining to the sewer line. if during the QC process the line is deemed <br />to be unsatisfactory, the line is rejected and re- inspected. After the lines have passed the <br />QC process they are saved on multiple hard drives ensuring nothing is lost if the working <br />hard drive should fail. <br />Once this step is complete all line segments are logged on an Excel Spreadsheet. This <br />spreadsheet shows progress of our current task and includes important information we feel <br />the City should be aware of; including RVP information, Red Flags, etc. Any lines having <br />nm_. _ . <br />City of Santa Ana Bid #13020 <br />Closed Circuit Teievhuon (CCTV) Inspection of Sanitary sewers <br />21831 Barton Road <br />Grand Terrace, CA 92313 <br />tea`' 909422.8990 P 9094224841 F <br />CA #884167 <br />
The URL can be used to link to this page
Your browser does not support the video tag.