Laserfiche WebLink
Project Timeline <br />All applicable line segments will be cleaned and videoed, per the enclosed work plan. The <br />anticipated linear feet (LF) of fine segment completed for both cleaning and video per 8- <br />hour day is approximately 3,0001-17— 3,200LF. The proposal estimates approximately <br />300,000 LF of line segment for the entire project. <br />PROJECT TIMELINE <br />Hydro-wash based an 3,000-3,200LF per day <br />Video Inspection based on 3,000-3,200LF per day <br />Manhole Inspection based on 35 per day <br />0 20 40 60 80 100 120 <br />a Project timeline based on 8-hour workdays <br />City of Sant. Ana Bid 413.020 <br />Closed Circuit Television (CCTV) Inspection of Sanitary Sewers <br />21831 Barton Road <br />J Grand Terrace, CA 02313 <br />9119-42U990 P 909,422.0841 F <br />am I CA #884167 <br />