My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
EXHIBIT 4-1_55A_BRISTOL WIDENING EIS-EIR
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2014
>
02/04/2014
>
EXHIBIT 4-1_55A_BRISTOL WIDENING EIS-EIR
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/2/2014 7:46:43 AM
Creation date
1/29/2014 3:20:49 PM
Metadata
Fields
Template:
City Clerk
Agency
Public Works
Item #
55A
Date
2/4/2014
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
414
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A commitment of resources associated with construction activities, including <br />concrete, steel, asphalt, base material, and additional energy in the form of <br />gas and electricity would be used during construction. <br />AA. UNAVOMABLE SIGNMCANTANSIGNTECANT ADVERSE IMPACTS <br />Impacts of the preferred alternative on the natural, physical, and social <br />environment have been discussed in the preceding sections. Mitigation <br />measures to reduce these adverse impacts have been identified, however, not <br />all adverse impacts can be reduced to an insignificant level. The remaining <br />insignificant and significant adverse impacts are summarized below: <br />InsigWficant Ir 1 gated <br />fl ■ fl 111- <br />Temporary construction detours would cause 'added congestion to <br />Bristol and local streets adjacent to the detour. Businesses within the <br />detour area would experience a drop in business activity affecting, to <br />various degrees, the sales tax revenue. A considerable amount of <br />inconvenience to the travelling public would occur in the immediate <br />vicinity of the project. Air quality surrounding the high activity areas <br />during construction would suffer a temporary degradation. Noise and <br />vibrations would also be an unavoidable adverse impact in the same <br />areas. Temporary disruption of utility services may occur during <br />construction. <br />Although these impacts cannot be fully mitigated, with the measures <br />cited in Section IV.V, the impacts would be mitigated to insignificant <br />levels, particularly given the temporary nature of construction- related <br />impacts. <br />2. Air Quality <br />Although the preferred alternative, on an overall basis, will have a <br />beneficial impact on air quality by increasing speeds and reducing <br />delays, the increased speeds will result in greater emissions of nitrogen <br />dioxide (NOx). The increase in N4x over the No- Project alternative, <br />however, is an insignificant one percent (525 pounds per day as <br />opposed to 52-0 pounds per day). <br />fV -89 <br />
The URL can be used to link to this page
Your browser does not support the video tag.