Laserfiche WebLink
KOA CORPORATION <br />PLANNING & ENGINKRING <br />Table 6 <br />Level of Service Analysis /Determination of Impacts <br />for Buildout Project Conditions <br />Note n oway in seconds per venicie avenge; Note Z: WS =Level of Service <br />Based on the intersection levels of service shown in Tables 5 and 6, for the "With Project" and `Without Project" <br />conditions, and using the significant impact criteria presented in the report 'Traffic Impact. Study for the TAVA <br />Hornes project at 1584 East Santa Clara Avenue in the City of Santa Ana ", there is expected to be a significant impact <br />to one of the study Intersections as a result of the project. The intersection of Santa Clara Ave at Wright Street <br />is expected to be impacted In the PM peak hour for the buildout condition as a result of the proposed project. <br />This Is the same conclusion as reached in the previous (201 1) traffic study. <br />Project Recommendations <br />Based on the results of the intersection and street segment analysis, the proposed project has a significant impact <br />and is subject to mitigation measures at the following location: <br />• Santa Clara Ave at Wright Street <br />TAVA Homes Supplemental Traffic Analysis <br />July 18, 2013 <br />75A -134 <br />Existing <br />Future <br />Future <br />Increase/ <br />Significant <br />Intersection <br />Without Project. <br />With Project <br />Decrease <br />Impact? <br />AM Peak Hour <br />Delay! <br />LOS 2 <br />Delay'' <br />LOS 2 <br />Delay' <br />LOS x <br />Santa Clara Avel <br />13.9 <br />B <br />17.9 <br />C <br />18,0 <br />C <br />0.1 <br />No <br />Wright Street <br />Santa Clara Ave/ <br />NA <br />N/A <br />N/A <br />N /A. <br />11.7 <br />B <br />N/A <br />No <br />Project Access <br />Wright Street( <br />Avalon Avenue <br />9.8 <br />A <br />10.3 <br />B <br />103 <br />B <br />0.0 <br />No <br />PM Peak Hour <br />Delay I <br />LOS 7 <br />Delay i <br />LOS 7 <br />Delay l <br />LOS a <br />Santa Clara Ave/ <br />Wr i ght Street <br />30.0 <br />D <br />81:3 <br />F <br />849 <br />f <br />3,6 <br />Yes <br />Santa Clara Ave( <br />ProjectAccess <br />NA <br />N/A <br />N/A <br />N/A <br />14.8 <br />- <br />B <br />N/A <br />No <br />Wright Street/ <br />9.5 <br />A <br />93 <br />A <br />9:8 <br />A <br />0.0 <br />No <br />Avalon Avenue <br />Note n oway in seconds per venicie avenge; Note Z: WS =Level of Service <br />Based on the intersection levels of service shown in Tables 5 and 6, for the "With Project" and `Without Project" <br />conditions, and using the significant impact criteria presented in the report 'Traffic Impact. Study for the TAVA <br />Hornes project at 1584 East Santa Clara Avenue in the City of Santa Ana ", there is expected to be a significant impact <br />to one of the study Intersections as a result of the project. The intersection of Santa Clara Ave at Wright Street <br />is expected to be impacted In the PM peak hour for the buildout condition as a result of the proposed project. <br />This Is the same conclusion as reached in the previous (201 1) traffic study. <br />Project Recommendations <br />Based on the results of the intersection and street segment analysis, the proposed project has a significant impact <br />and is subject to mitigation measures at the following location: <br />• Santa Clara Ave at Wright Street <br />TAVA Homes Supplemental Traffic Analysis <br />July 18, 2013 <br />75A -134 <br />