My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75A - PH - EIR -1584 E SANTA CLARA AVE
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2014
>
03/04/2014
>
75A - PH - EIR -1584 E SANTA CLARA AVE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/27/2014 5:04:05 PM
Creation date
2/27/2014 4:53:25 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Planning & Building
Item #
75A
Date
3/4/2014
Destruction Year
2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
180
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
KOA CORPORATION <br />PLANNING a ENGINEERING <br />Stop delay on Santa Clara Avenue at Wright Street is expected to increase by 3,6 seconds in the PM peak hour <br />under buildout conditions due to the proposed' project. Level of Service is at LOS F under these conditions. The <br />proposed project contributes 9 trips to the Intersection in the PM peak hour, The poor level of service reported <br />for Santa Clara Avenue/Wright Street is due to the northbound left movement of vehicles turning -from the minor <br />leg (Wright Street) onto the major street (Santa Clara Avenue). Mitigation measures are recommended at this <br />location to maintain an adequate Intersection level of service. Possible measures include installation of a traffic . <br />signal or by construction of a roundabout or wide (14 -foot) 2-way left-turn lane. These measures are the same as <br />recommended in the previous (2011) traffic study. <br />Traffic signal warrants were tested for the Intersection of Santa Clara Avenue at Wright Street. Under near -term <br />traffic conditions, the 8 -hour Interruption of Continuous Traffic Warrant was met. Under buildout with project <br />traffic conditions, the Pealc Hour Warrant and the 8-hour Interruption of Continuous Traffic Warrant were both <br />met. <br />Conclusions <br />The intersection level of service analysis conducted for the proposed site plan change and revised project trip <br />distribution determined that there is :a significant impact to one intersection, Santa Clara Avenue at Wright Street, <br />as a result of the project. This is the same conclusion as reached in the previous (201 1) traffic study: Mitigation <br />measures will be required at this intersection. Recommended measures include a traffic signal, roundabout, or <br />wide (14 -foot) 2 -way left -turn lane. Again, the recommended mitigation measures are the same as recommended <br />in the previous (201 1) traffic study.. <br />Expected street segment level of service on Santa Clara Avenue between Grand Avenue and Tustin Avenue <br />conducted for the revised project trip distribution under Buildout With Project conditions is poor (Level E). The <br />expected LOS E conditions are due to a combination of existing traffic volumes and ambient traffic growth, not as <br />a result of added traffic volumes from the project. <br />KOA Corporation hopes that the review and recommendations conducted for the revised site plan and trip <br />distribution for the TAVA Homes ,project will assist the City in evaluating the potential traffic impacts and <br />mitigation measures of the proposed project. KOA is ,available to assist the City in any further traffic analysis of <br />the project area as needed. <br />TAVA Homes Supplemental Traffic Analysis <br />July 18, 2013 <br />75A -135 <br />
The URL can be used to link to this page
Your browser does not support the video tag.