Laserfiche WebLink
Step 5. <br />Each of the project's water resource supply portions identified in Step 2 is scored <br />separately. Water Resources Availability scoring is performed by identifying the <br />appropriate condition that applies to each portion of the project, as identified in <br />Table 5., Water Resource Availability Scoring. Using Table 5, identify the option <br />that best describes the water resource availability for that portion and its <br />corresponding water resource score. Option 1 defines the condition of no <br />restrictions on water resource availability and is followed progressively with <br />increasing restrictions to Option 14, the most severe condition, where neither <br />irrigated nor dryland production is considered feasible. Enter each score into <br />Column D of Table 4. <br />Step 6. <br />For each portion of the project site, determine the section's weighted score by <br />multiplying the portion's score (Column D), by its proportion of the project area <br />(Column C), and enter these scores in Column E, the weighted Water Availability <br />Score. Sum the Column E scores to obtain the total Water Resource Availability <br />Score, and enter this figure in Line 4 of the Final LESA Score Sheet (Table 8). <br />19 <br />