My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
DELHI CENTER - DELHI PARK CONSTRUCTION AND FUNDING AGMT-2000
Clerk
>
Contracts / Agreements
>
D
>
DELHI CENTER - DELHI PARK CONSTRUCTION AND FUNDING AGMT-2000
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2017 2:29:34 PM
Creation date
6/17/2014 1:34:47 PM
Metadata
Fields
Template:
Contracts
Company Name
DELHI CENTER
Contract #
A-2000-171
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
09/01/00 <br />24. Interior Doors: <br />All interior door frames to utilize black western integrated or timely door frames. Wood doors to <br />be solid core paint grade wood, hardware to be Schlage "D" Series throughout, with Schlage "L ", <br />Niortise series at exterior doors. <br />25. Acoustical Ceilings: <br />Ceiling material shall be in accordance to M.V.E. reference plans issued 9/30/98. <br />26. Toilet Partitions: <br />Toilet partitions to be floor mounted overhead braced plastic laminate or metal of a standard <br />color. Material shall be in accordance to M.V.E. reference plans issued 9/30/98. <br />27. Signage: <br />Required code interior building signs and site required ADA signs are included as an allowance <br />of $10,000 and shall be selected from standard colors and fabrications. No exterior building <br />signage or monument signage are included. <br />28. <br />29. <br />30. <br />31. <br />— - 32. <br />Furnishings: <br />No furnishings are included. <br />Window Coverings: <br />No blinds or window coverings are included. <br />Exterior Plaster <br />The exterior of the building has been redesigned to eliminate all exterior masonry veneer and <br />replace with exterior plaster with anti - graffiti coating to 9' -0" above finished grade <br />Voice and Data Wiring: <br />All actual voice and data wiring costs are by the tenant and/or Owner responsibility. Conduit and <br />raceway only to be installed by the Contractor with painted backboards at electrical room only. <br />Subcontractors Bonds: - <br />Subcontractor bond costs has been included as an allowance of $36,650. <br />33. Contract Allowances: <br />The following allowances are specifically included. Amounts shall be adjusted based upon actual <br />costs: $255,104 <br />a. General Conditions (not to exceed) $15,000 <br />b. Energy Management/Security System $10,000 <br />c. Building Code Signage $10,225 <br />d. Site Furnishings — Fences and Gates $30,000 <br />e. Site Electrical <br />5 <br />F: \Data \PROJ E CTS \9929\Co ntra cts \Ex hib itA. doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.