My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
RMC WATER AND ENVIRONMENT, INC. - 2014
Clerk
>
Contracts / Agreements
>
R
>
RMC WATER AND ENVIRONMENT, INC. - 2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/11/2016 4:54:59 PM
Creation date
10/3/2014 3:51:11 PM
Metadata
Fields
Template:
Contracts
Company Name
RMC WATER AND ENVIRONMENT, INC.
Contract #
A-2014-187
Agency
PUBLIC WORKS
Council Approval Date
8/5/2014
Expiration Date
6/30/2017
Insurance Exp Date
10/14/2016
Destruction Year
2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
preventive maintenance plan, including the EMLs, identified locations from the FOG <br />program, and the "hot- spots ". Based on this infortnation, the consultant shall <br />recommend any maintenance. enhancement measures for these hot- spots, QMR Grade <br />5 locations, or other at -risk locations, that should be included within the CIP (Le, <br />smart covers, additional cleaning frequency, additional field monitoring, monthly <br />manhole inspection, etc.), These maintenance recommendations shall be included <br />within the CIP with references to specific locations and reaches of the sewer. <br />4. The consultant shall recommend, incoordination with the City, aten (10) year CIP to <br />implement the prioritized projects. The CIP shall be financially constrained based on <br />the projected available CIP budget. <br />5. The consultant shall also recommend additional monitoring, measurement or program <br />modifications for the remaining projects that are not included within the ten (10) year <br />CIP. The intent of this task is to provide new tools and methods to assist the City in <br />its implementation of the Sewer System Management Plan more effectively and <br />efficiently. <br />G. 1?eliverables and Training <br />L Prepare a comprehensive written report describing the work performed, findings and <br />recommendations including the Capital Improvement Program. The report shall be <br />organized in a similar manner to the 2003 Sewer Master Plan, The consultant shall <br />submit six (6) copies of the draft report for City review. The consultant shall make a <br />presentation of the draft report to the City. After the City has reviewed the draft <br />report, the consultant shall meet with the City to discuss comments, modifications, <br />revisions, etc. The consultant shall incorporate the City's comments and final the <br />report. <br />2. The consultant shall deliver ten (10) bound copies of the Sewer Master Plan Update <br />Final Report to the City including all color maps and exhibits. The consultant shall <br />also provide a digital Mile of the final report in PDF format. The final report shall be <br />signed and stamped by a Registered Civil Engineer, <br />3, The consultant shall deliver a copy of the final turnkey sewer system model to City <br />and train staff on its use. The consultant shall hold a meeting at the City to present <br />the final sewer system model, explain the various model runs; and the model output. <br />The consultant shall load the model and corresponding model input and output files <br />onto the City's network. The consultant shall provide the City staff with complete <br />model maintenance manuals and provide copies of all training materials; The <br />consultant will be required to run several specific analyses using the City's computer, <br />program and data files. <br />4. Provide workshop minimum of twelve (12) hours for training on the model details, <br />software delivery platform, and methods and methodology behind ongoing use and <br />maintenance of the hydraulic model. The trainings shall be broken down into <br />
The URL can be used to link to this page
Your browser does not support the video tag.