Laserfiche WebLink
W.A. RASIC CONSTRUCTION COMPANY, INC. <br />REFERENCES <br />OWNERIAOENCY LOCATION DATE CONTRACT <br />CONTACT <br />COMPLETED AMOUNT <br />NAME PHONE <br />!Since 1978, W.A. Rasic Construction has the ability to construct a wide range of projects both in terms of size and type. From $5,000 <br />futility Installations to multi- million dollarpipellne projects, W.A. Rasic Construction has constructed some of the most difficult civil <br />construction projects In the Western United States. Our capabilities include Water / Wastewater (Transmission /Distribution/ <br />'.Treatment) Pipelines, Storm Drainage, Concrete Facilities, Dry Utilities (communication /electrical), Mechanical Piping, Petroleum <br />Systems, Demolition and Crushing, Inspection Services, Design -Build Projects, Extensive Shoring, and Emergency Response Services. <br />We proudly stand as one of the few contractors with the Flexibility, diversity, and capability to span the full spectrum of civil <br />construction. While self-performing over 1,000 contracts yearly, W.A, Rasic Construction has listed below some of our signature <br />projects that represent over 400 million dollars in project references. For additional project references, please contact W.A. Rasic <br />Construction or visit our website at www.waresic.com. <br />COUNTY OF SAN LUIS OBISPO Los 01 Ce Je44 $29,425,000 <br />James Brantley, P.E. (805) 801 -6162 <br />Los Osas Wastewater Collection System Project Areas B &C <br />This project Involves the Installation of 81,306 -If of Sewer gravity mains ranging In size from 6 to 18 Inches, 17,516-4 of Sewer <br />fame mains ranging from 3 to 16 Inches, 203 manholes, 1,757 service laterals, 27,01 NIT of gber epiio condult, and 27,264 If of <br />recycled effluent farce mains ranging from 2 to 12 inches. The project also included Wet Wells and ancillary items consisting <br />of one Pocket Pump Station, three Duplex Submersibel Stations, and one Triplex Station. Other work includes an effluent <br />disposal system consisting of site preparation and 19,77641 of subsurface perforated pipe and arched Infiltraflon chambers <br />This environmentally sensitive project will provide meander collection, conveyance, treatment, and recycled <br />Water ap8e jar the LeaQ8o8 Lpmmani Itlat is currently MBewared and utilized septic lank! <br />_ <br />ORANGE COUNTY PUBLIO WORKB Yorba Linde, Ca blue $41,850000 <br />Ju Kim (714)976 -0126 <br />SARI Relocation Including Metering Station <br />JIPA pyr; gggov,com <br />This project Involves the Installation of 20,630 -I1 of 54" FRP Sewer and associated structures along the Santa Ana River <br />to replace the aging existing 42' Interceptor Sewer. Open out Installations range from I tire 30' deep along the existing <br />levee roads. There is also 2,8084f of 94" RCP casing Installed via Slurry Micatunneling method, up to ten <br />funneling shafts at depths to 70' deep, concrete Inlet and outlet structures, a below ground metering station, and elaborate <br />dowatedng system, This highly orchestrated project Includes mitigsion measures for wild life, native plants and birds, <br />bicyclists, and campers within the project site. <br />LOS ANGELES WORLD AIRPORT Los Angeles, Ca Mardi $30,000,000 <br />Tyler Chappell (310) 351 -5907 <br />Central Utility Plant Replacement Pri <br />Construct chilled water supply and return lines, hot water supply and retum Imes, domestic water supply, reclaimed water <br />supply, underground power and communication systems to support the new Centel U9lity Plant (CUP) in the worlds 6th <br />busiestairpon. Project includes providing BIM modeling for all portions of the underground work, excavation and the <br />Installation of beam and plate shoring for the majority, of the 18 miles of total new piping installation, Other work Includes <br />cast In place vaults, extensive traffic control, tunneling underneath world way into the new Tom Bradley international <br />Terminal and asphalt restoration. <br />CALLEGUAS MUNICIPAL WATER DISTRICT Moorpark, Ce December -12 $6,275,000 <br />Shomna Summer, P.E. (805) 579 -7156 <br />Emergency Pipe Procurementand Storage <br />Procurement of emergency steel pipe, liners, cylinders, fittings, and appurtenances varying in size from 14" diameter to 72" <br />diameter to be stored onsite for future emergency repairs to Calleguas MW) facilities. This work also includes site work and <br />grading to place and bury selected pipe and fittings underground for storage, above ground cylinder storage bays, and <br />construction of a prefabricated metal building warehouse. <br />YUCAIPA VALLEY WATER DISTRICT San Bernardino, Ca August -12 $9350000 <br />Brent Anton (909)797 -5118. <br />Yucaipa Valley Regional Srinaline Extension Phase 3 <br />Construction of 24,40041 of 20" HOPE bdneline, throughout three cures through existing streets, right -of -ways, and beneath <br />two waterways. In addition 2,300df of 20" HDPE to be Installed via dinagonal drilling under San Tobago Creek and the <br />Santa. Ana River at depths greater than Wei and 1, 800 4 of20' HOPE to be installed via jacked casing in six locations. <br />LA. COUNTY DEPARTMENT OF PUBLIC WORKS Long Beach, Ca January-12 $24,256,012 <br />Ali Zadeh (626) 458.3104 <br />Termino Avenue Di <br />The Installation of 6,309 linear feet of Cast- In-Placa and Precast Reinforced Concrete Box Culvert ranging in sizes up to <br />Double 9W x e'h; 8.800 linear feet of 72" to 18' RCP Stan Drain Piping; 1,200 linear feet of 78" Direct Jack and Bore RCP, <br />and over 100 Catch Basins equipped with fresh excluder screens and filtration, Other work Includes construction of a Low <br />Flaw Diversion Structure to capture and divert non -stone event runoff to existing sewers, installation of a temporary Sheet <br />Pile Cofferdam, utilization of a groundwater treatment system capable of treating over 1:1 MGD, and removal and <br />treatment o1.8,900 Iona of h drocorbon contaminated soils.. <br />LOS ANGELESAEd'A'81 EN`t OtWATERAPOWER '. Las rgeles;Cvb anticipated $49,135,518 <br />CBades Ngo (213) 887 -2319 . <br />River Supply Conduit - Unit 8 March-12 <br />The Installation of 11,200 linear feel of 96" CM= steel pipe utilizing hydraulic passed in sheet pile to protect the existing <br />lions vintage 66' RCP waterline running parallel to the proposed pipeline. The project will also require 1,400 linear feet <br />of 108' diameter jacked steel : casing -three concrete vaults; and a 220 foot deep anode ground tied. <br />