W.A. RASIC CONSTRUCTION COMPANY, INC.
<br />REFERENCES
<br />OWNERIAGENCY LOCATION DATE CONTRACT CONTACT
<br />COMPLETED AMOUNT NAME PHONE
<br />LOS ANGELES DEPARTMENT of WATER &POWER Los Angeles, Ca March-12 :$38,74497.
<br />All Sabouml, P.E. (213) 3672637
<br />City hunk Line South - Unit 1
<br />The Installation of 10,400 linear feet of 66 "CML &C steal pipe. The majorl the pipeline will be installed via open out
<br />melirodsand 2,100 linear feet will be Installed by tunneling utllizing an earth pressure balance machine (EPBM) at 78"
<br />rharbi The entire open cut Installation will be Installed udflzing solid sheet shoring and hydraulically pressed in sheet
<br />pile. Pipeline and tunnel Construction up to depths of 40'. The progress of Ole work will he Controlled via a City mandated
<br />n idxafe taldOwnS,711eretl sa ences; including: 32 work areas and various II In Connections,
<br />EASTERN MUNENO— L WA ER (STRICT Murrieta, Ce Apdp10 $6,036y708
<br />f Gabe Maecenas, P.E. (951) 9283777
<br />MorlieterArea Sewer Improvement Project
<br />x4475
<br />The rehabllllatlon of 5,800 linear feet of existing 12' and 16" VCP gravity sewer by utilizing the pipe bursting method; The
<br />Pax (111928-6111
<br />pipe will be replaced by pneumstically bui the existing pipe and then winching in a new 20" HOPE pipe. The pipeline
<br />aligninere transverses sensitive biological end environmental areas requiring multlagency caoperetlon. Other work
<br />includes wrbpasin psewer manhextensive dawatern and treatment and roafivap restoraton. In
<br />Cge LO A GE Y SA ATgON'DISTRICT Carson, OR Nevernber10 VISS0o48s
<br />Russ Vakhada (310) 83MOSO
<br />Joint Ougall 'C" Unit 1 Relief Trunk Sewer, Phase i
<br />The Installation of 4,400 linear feet of 90° PVC Llned RCP Sewer placed in a 12 -foal diameter rib- end -leg I l and
<br />1,200 linear feet installed by open cut method to depths ranging from 2030' feet deep. Other work includes 400 linear
<br />toot of 10" Jet Fuel line relocation to accommodate the deep tunneling shafts as well as the installation of cast in place
<br />Connote. Junction Structures, An Is Point Structures, manholes, live sewer tie -ins, and restoration of existing Improvements:
<br />CITY OF ANAHEIM Anahelm, Ca Nosri 08 :$3;900;000
<br />Caster Willams (714) 765 -5176
<br />City Switching Stations No. 10, 11, and 12.
<br />The installation of 12,200 linear feet of encased 12kv duct bank and 17 Pre -cast structures,: Other work induced removal
<br />and replacement of the asphalt roadway and Concrete restoration, The project required multiple headings, mulpple
<br />shifts and coordination with the Disneyland Resort as well as Callrane.
<br />JOHNSON PELTIER ELECTRIC Anaholm, Co November -06 $4;50OWO
<br />Tom Funds (562) 9443408
<br />12tH Upgrade at the Disneyland Resort
<br />The Installation of 10,000 linear feet of duct bank, associated grounding gold as well as 30 precast electrical structures,
<br />coops(, equipment pads, relocation of various utilities to facilitate precast structure installation, and restoration of existing
<br />improvements thmddroa kthe Olsneyla ld Resort
<br />METROPOLITAN WATER DISTRICT pods, Ca December 08 $40,709,918
<br />Wally Lleu (213)435.2727
<br />PE'RRIS VALLEY PIPELINE - NORTH REACH
<br />The installation of 27 miles of owner furnished 96" and 106" Steal Pipe at depths up to 60' deep. Other work Includes
<br />cast in place Concrete vaults, butterfly valves, flow, meters, tunneling through solid Rock, extensive rock removal and
<br />blaStrig,droaiming, blow -of and air vac Installation, and wmplaka roadway removal and raplasRoland
<br />EASTE liPALWAER DISTRICT Moreno Valley, Ca Nov -08 $5;609,tW0
<br />Kad Roland (951)028.3777
<br />CAMS AVE FEEDER PROJECT
<br />x4442
<br />The installallon of 2.6 miles of EMWD Furnished 48' Steel Pipe. Other work includes the installation of4W Butterfly Valves,
<br />1(951)928.6111
<br />640 linear feet of 66" C,slog by Bare and Jack Operation, Air Releases, and Blow -Oh Installatian.
<br />EASTERN MUNICIPAL WATER DISTRICT Temecula, Ca Apr -08 $3,469004
<br />Bruce Ross (951)928.3777
<br />OEMSALSIILD � DIAZ FORCE MAIN EMERGENCY REPLACEMENT
<br />x 4461
<br />Provided engineering design and installation of 6,4001.(. of 24' PVC Force Main. Other work Included the installation of a
<br />Fax (951) 928.6111
<br />Above ri' a etem;.fastaillm" IT'set of 60 "casing by bore andja'rvs method, sewer by-parsing, and roadway restoration
<br />EASTER. MUNICIPAL WATER DISTRICT 5ANJACINTO7 August -06 310,021,745
<br />Gabo Necochea,PE. (951)9283777
<br />NORTH SAN JACINTO SEWER PHASE it
<br />x 4475
<br />The installation of 3,500 LF of 2N'& 27' Amkech Polyerete Pipe by Mlcrotunneling, 4,600 LF of 16' & 24" PVC
<br />Fax (951) 920 -6111
<br />by 0 enCUt lns(alfsftoa, Beam & Plate Shormi Extensive Dowa eirm; and Sewer Hy.Pessta
<br />METRpPQL(AN ATER OJ T3 - Perris, Gaza Jun -p7 10;822,900
<br />WaftylLeu 213)435.2727
<br />COLORADO RIVER AQVEDUCTREHABILITATfON Parker, AZ
<br />Utilized 200 WA. Rasic Employees to Dewater 150 Million Gallons of Water from the Colorado Rlver Aqueduct
<br />tofadlitate the Installation of 50 mechanical blow -offs, abandoning 27 transition drains, rehabllites and recoat
<br />two radial gates, install flow metering system at Copper Basin Inlet tunnel, and provide access for inspection
<br />of Storm by MWD: inspectors;
<br />EASTIFItN MUMCIPAI WATER DISTRICT I YEAGFR SWANSEA TEMECULA Jul -07 $1,982282
<br />Amanda Arroyo, P.E. (951) 929 -3777
<br />TEMECULA EDUCA77ON CENTER
<br />1 (951) 920.8111
<br />Install 900LFot36 "Hobos Pao, Trench.Dootefat Bean & Plate SYwnng, SewerB�Passin
<br />MCCAKWBUILDINO COMPANIES/ CITY OF LOS ANGELES ii A.GE 3 Jut-07 52,672,71fl
<br />Rob Ragland, P.E. (949) 651 -833
<br />VERMONT MANCHESTER SEWER PROJECT
<br />Fax (949) 851.8398
<br />First open cut Noose Pipe Installation pmjeol over performed In the City of Las Angeles
<br />Install 1300 LF of 27" Holeas Sewer Pipe, Lateral Installation, & Sewer By- Possidg
<br />LONG .BEACIFI WATER DEPARTMENT LONG BEACH J017 07 $3,229;600:
<br />Isaac Pal, P.E. (562)670+2336
<br />DIVISIONSTREET SEWER IMPROVEMENT
<br />Fex (562) 570 -2330
<br />Install 5,000 11 of 12" DIP Force Main & 1,100 J. of 18" VCP;. Extensive Dowatedng
<br />INLAN0 EMPIRE UTILITIES AGENCY ONTARIO Jul -07 $6,121,057
<br />Scott Johnson (909) 993 -1625
<br />SANANTONIO CHANNEL PIPELINE - SEGMENTA
<br />Fax (909) 5978875
<br />Install 96;0001.f. of 24" CML &C SIe,IP1pe