Laserfiche WebLink
W.A. RASIC CONSTRUCTION COMPANY, INC. <br />REFERENCES <br />OWNERIAGENCY LOCATION DATE CONTRACT CONTACT <br />COMPLETED AMOUNT NAME PHONE <br />LOS ANGELES DEPARTMENT of WATER &POWER Los Angeles, Ca March-12 :$38,74497. <br />All Sabouml, P.E. (213) 3672637 <br />City hunk Line South - Unit 1 <br />The Installation of 10,400 linear feet of 66 "CML &C steal pipe. The majorl the pipeline will be installed via open out <br />melirodsand 2,100 linear feet will be Installed by tunneling utllizing an earth pressure balance machine (EPBM) at 78" <br />rharbi The entire open cut Installation will be Installed udflzing solid sheet shoring and hydraulically pressed in sheet <br />pile. Pipeline and tunnel Construction up to depths of 40'. The progress of Ole work will he Controlled via a City mandated <br />n idxafe taldOwnS,711eretl sa ences; including: 32 work areas and various II In Connections, <br />EASTERN MUNENO— L WA ER (STRICT Murrieta, Ce Apdp10 $6,036y708 <br />f Gabe Maecenas, P.E. (951) 9283777 <br />MorlieterArea Sewer Improvement Project <br />x4475 <br />The rehabllllatlon of 5,800 linear feet of existing 12' and 16" VCP gravity sewer by utilizing the pipe bursting method; The <br />Pax (111928-6111 <br />pipe will be replaced by pneumstically bui the existing pipe and then winching in a new 20" HOPE pipe. The pipeline <br />aligninere transverses sensitive biological end environmental areas requiring multlagency caoperetlon. Other work <br />includes wrbpasin psewer manhextensive dawatern and treatment and roafivap restoraton. In <br />Cge LO A GE Y SA ATgON'DISTRICT Carson, OR Nevernber10 VISS0o48s <br />Russ Vakhada (310) 83MOSO <br />Joint Ougall 'C" Unit 1 Relief Trunk Sewer, Phase i <br />The Installation of 4,400 linear feet of 90° PVC Llned RCP Sewer placed in a 12 -foal diameter rib- end -leg I l and <br />1,200 linear feet installed by open cut method to depths ranging from 2030' feet deep. Other work includes 400 linear <br />toot of 10" Jet Fuel line relocation to accommodate the deep tunneling shafts as well as the installation of cast in place <br />Connote. Junction Structures, An Is Point Structures, manholes, live sewer tie -ins, and restoration of existing Improvements: <br />CITY OF ANAHEIM Anahelm, Ca Nosri 08 :$3;900;000 <br />Caster Willams (714) 765 -5176 <br />City Switching Stations No. 10, 11, and 12. <br />The installation of 12,200 linear feet of encased 12kv duct bank and 17 Pre -cast structures,: Other work induced removal <br />and replacement of the asphalt roadway and Concrete restoration, The project required multiple headings, mulpple <br />shifts and coordination with the Disneyland Resort as well as Callrane. <br />JOHNSON PELTIER ELECTRIC Anaholm, Co November -06 $4;50OWO <br />Tom Funds (562) 9443408 <br />12tH Upgrade at the Disneyland Resort <br />The Installation of 10,000 linear feet of duct bank, associated grounding gold as well as 30 precast electrical structures, <br />coops(, equipment pads, relocation of various utilities to facilitate precast structure installation, and restoration of existing <br />improvements thmddroa kthe Olsneyla ld Resort <br />METROPOLITAN WATER DISTRICT pods, Ca December 08 $40,709,918 <br />Wally Lleu (213)435.2727 <br />PE'RRIS VALLEY PIPELINE - NORTH REACH <br />The installation of 27 miles of owner furnished 96" and 106" Steal Pipe at depths up to 60' deep. Other work Includes <br />cast in place Concrete vaults, butterfly valves, flow, meters, tunneling through solid Rock, extensive rock removal and <br />blaStrig,droaiming, blow -of and air vac Installation, and wmplaka roadway removal and raplasRoland <br />EASTE liPALWAER DISTRICT Moreno Valley, Ca Nov -08 $5;609,tW0 <br />Kad Roland (951)028.3777 <br />CAMS AVE FEEDER PROJECT <br />x4442 <br />The installallon of 2.6 miles of EMWD Furnished 48' Steel Pipe. Other work includes the installation of4W Butterfly Valves, <br />1(951)928.6111 <br />640 linear feet of 66" C,slog by Bare and Jack Operation, Air Releases, and Blow -Oh Installatian. <br />EASTERN MUNICIPAL WATER DISTRICT Temecula, Ca Apr -08 $3,469004 <br />Bruce Ross (951)928.3777 <br />OEMSALSIILD � DIAZ FORCE MAIN EMERGENCY REPLACEMENT <br />x 4461 <br />Provided engineering design and installation of 6,4001.(. of 24' PVC Force Main. Other work Included the installation of a <br />Fax (951) 928.6111 <br />Above ri' a etem;.fastaillm" IT'set of 60 "casing by bore andja'rvs method, sewer by-parsing, and roadway restoration <br />EASTER. MUNICIPAL WATER DISTRICT 5ANJACINTO7 August -06 310,021,745 <br />Gabo Necochea,PE. (951)9283777 <br />NORTH SAN JACINTO SEWER PHASE it <br />x 4475 <br />The installation of 3,500 LF of 2N'& 27' Amkech Polyerete Pipe by Mlcrotunneling, 4,600 LF of 16' & 24" PVC <br />Fax (951) 920 -6111 <br />by 0 enCUt lns(alfsftoa, Beam & Plate Shormi Extensive Dowa eirm; and Sewer Hy.Pessta <br />METRpPQL(AN ATER OJ T3 - Perris, Gaza Jun -p7 10;822,900 <br />WaftylLeu 213)435.2727 <br />COLORADO RIVER AQVEDUCTREHABILITATfON Parker, AZ <br />Utilized 200 WA. Rasic Employees to Dewater 150 Million Gallons of Water from the Colorado Rlver Aqueduct <br />tofadlitate the Installation of 50 mechanical blow -offs, abandoning 27 transition drains, rehabllites and recoat <br />two radial gates, install flow metering system at Copper Basin Inlet tunnel, and provide access for inspection <br />of Storm by MWD: inspectors; <br />EASTIFItN MUMCIPAI WATER DISTRICT I YEAGFR SWANSEA TEMECULA Jul -07 $1,982282 <br />Amanda Arroyo, P.E. (951) 929 -3777 <br />TEMECULA EDUCA77ON CENTER <br />1 (951) 920.8111 <br />Install 900LFot36 "Hobos Pao, Trench.Dootefat Bean & Plate SYwnng, SewerB�Passin <br />MCCAKWBUILDINO COMPANIES/ CITY OF LOS ANGELES ii A.GE 3 Jut-07 52,672,71fl <br />Rob Ragland, P.E. (949) 651 -833 <br />VERMONT MANCHESTER SEWER PROJECT <br />Fax (949) 851.8398 <br />First open cut Noose Pipe Installation pmjeol over performed In the City of Las Angeles <br />Install 1300 LF of 27" Holeas Sewer Pipe, Lateral Installation, & Sewer By- Possidg <br />LONG .BEACIFI WATER DEPARTMENT LONG BEACH J017 07 $3,229;600: <br />Isaac Pal, P.E. (562)670+2336 <br />DIVISIONSTREET SEWER IMPROVEMENT <br />Fex (562) 570 -2330 <br />Install 5,000 11 of 12" DIP Force Main & 1,100 J. of 18" VCP;. Extensive Dowatedng <br />INLAN0 EMPIRE UTILITIES AGENCY ONTARIO Jul -07 $6,121,057 <br />Scott Johnson (909) 993 -1625 <br />SANANTONIO CHANNEL PIPELINE - SEGMENTA <br />Fax (909) 5978875 <br />Install 96;0001.f. of 24" CML &C SIe,IP1pe <br />