Laserfiche WebLink
W.A. RASIC CONSTRUCTION COMPANY, INC. <br />REFERENCES <br />OWNERIAGENCY LOCATION DATE <br />CONTRACT <br />CONTACT <br />COMPLETED <br />AMOUNT <br />NAME <br />PHONE <br />EASTERN MUNICIPAL WATER DISTRICT HEMET September=06 <br />$2,540,814 <br />BRUCE ROSS <br />(951(928.3777 <br />CAWSTONAVENUE EMERGENCYDESIGN -BUILD SEWER PROJECT <br />x 4461 <br />Provided englneedng design and Installation of 10,0001J. of 16" PVC Force Main. Otherwork Included <br />Fax (951) 9286111 <br />the Installation of 200 feet of 42" casing by bare and lack method, sewer by- passln , testing end roadway restoration <br />CITY OF DANA POINT DANA POINT November -0& <br />$7,749,595 <br />MATT SINACORI, RE. <br />(949) 248 -3574 <br />MASTER PLAN OF DRAINAGE, PRIORITY 1, PHASE II <br />Fax (949) 248 -7372 <br />Install approx 4,800 Lf. of42 " -72" RCP by Open Cut & Tunneling Methods.. Cons"d an Ouffall Structure <br />on Capistrano Beach at a depth of 25 feet below ground water levels by building a Cofferdam utilizing <br />e Sheet Pile Shorin S slam <br />C 0 R - RS10E RIVERSIDE May -06 <br />$3.676.183 <br />bLAkEYAWAMOTO <br />951)8 86549 <br />WATERMAN AVE 54 "WATER TRANSMISSION MAIN, PHASE R <br />Fax (961) 8282498 <br />Install 4,500 Lf. of 54" CMLBC Steel Pipe, 200 U. of Bore & Jack with a 66' Casing <br />L.A. COUNTY DEPARTMENT OF PUBLIC WORKS HACIENDA HEIGHTS Decerni <br />$3,587,726 <br />GRISELDA MITCHELL <br />(626)458.3155 <br />NINTH AVENUE STORM DRAIN <br />Fax (626) 90 &2197 <br />Install a rox 16,000 6L of 16 • 60" RCP pipe; Install 95 Catch Baalne <br />'R <br />I.. O N <br />CITY NEWPORT BEACH December -05 <br />$3,467,280 <br />MICHAELSINACORI <br />(949) 644-3342 <br />WATER AND SEWER MAIN REPLACEMENT <br />Fax (949) 644418 <br />Install a roxfi_LL Of 24" CML& C; In approx 1,000 Lf.W21 "VCP <br />CUCAMON0 VALEEYWATER'OM ICT CU AMbNGA May -05 <br />$6,162,399 <br />MARTY ZUVARBULAS <br />(999)987 -2891 <br />ARROWHEAD PIPELINE <br />Fax (909) 476.7031 <br />Installation of 45,000 Lf. of 6 " -12" HDPE at an elevation of 5,000 feat in the San Gabriel Mountains. Other work included <br />assure reducho stations tunnel rehabilitation and construction of 2,5 miles of temporary made to facilitate <br />construction. <br />EASTERN MUNICIPAL WATER DISTRICT MURRIETA Navambeo-04 <br />$4,278,079 <br />Bruce Mizel <br />(951)928.3777 <br />TEMECULA RECYCLED WATER PIPELINE <br />Fax (951) 9286111 <br />Install 18,600 Lf. of48 ' CML &0 ownerfumished pipe), <br />INLAND EMPIRE UTILITIES AGENCY' FONTANA CNOber-04 <br />$3,616,746 <br />RYAN GROSS <br />(909)556.9572 - <br />CHINOJURUPA BASIN FACILITIES IMPROVEMENT PROJECT <br />Fax (909) 356 -9384 <br />Install 11,500 Lf. of 36" CML & C <br />IRVINE RANCH WATER DISTRICT IRVINE June -04 <br />$854,436 <br />BILL STEWART <br />(949) 453 -5610 <br />RECLAIMED WATER SYSTEM VALVE REPLACEMENT <br />Fax (949) 453 -5354 <br />Replace 18 Reclaimed Water Valves <br />L, A. COUNTY DEPARTMENT OF PUBLIC WORKS GLENDALE February -04 <br />$1,009,524 <br />LINDA TACCONELO <br />(626) 4583147 <br />LINES D, E & F STORM DRAIN <br />Fax (626) 458.2197 <br />Install 5,000 Lf. of 18'- 30" RCP pipe <br />CITY OF GLENDORA GLENDORA February -O4 <br />j810,992 <br />JERIUS WILLIAMS <br />(626) 914 -8254 <br />00" WATER MAIN TRANSMISSION PIPELINE <br />Fax (626) 963 -7486 <br />Install 3,000 tf. of 30" Welded Steal PI e <br />LAS RGENES I PALWATERDISTRICT CALABASAS January-04 <br />$5.411.380 <br />ROMMEL MARZAN <br />(8181 <br />MAJOR POTABLE WATER TRANSMISSION PIPELINES <br />Fax (818) 251 -2159 <br />Install 13,530 6L of 18" 8 20" PVC.pI e; Install approx 5,400 LE of 42" Welded Steel Watedine <br />CITYOF NE 0 T8EAH NEWPORTSEACH Aug 03 <br />$2,360,686 <br />MICHAEL SINACORI <br />(949)644.3342 <br />24" WATER MAIN REPLACEMENT <br />Fex (949) 644.3318 <br />Install approx 8,300 J. 24" Cl Steel Pipe <br />CALIFORNIA AMERICAN WATER COMP NY - INGLEWOOD Sup-b2 <br />$386,006 <br />JAY BURNETT <br />(626) 289 -7924 <br />ANGELES VISTA BLVD MAIN REPLACEMENT <br />curt 25 <br />Install 5,400 LL 16: DIP; replace 80 services 810 hydrants <br />Pax (626 281.6807 <br />WEST BASINRMNICIPALWATER DISTRICT LOSANGELES eap -02 <br />$9911056 <br />PAUL COOK <br />(816)5661 -624ti <br />"STSIDE WATER RECYCLING <br />Fax (310) 2174414 <br />Instal( 2,9001:(. of 16' Ducille Iron Pipe <br />CITY OF ESCONDIDO ESCONDIDO Map02 <br />'.$4,330;158 <br />JCHN KEARNEY <br />(626) 9468030 <br />RECLAIMED WATER DISTRIBUTION SYSTEM <br />InslaV 92:000 Lf. of 8' -18" PVCIDIP <br />CITY OF GARDEN GROVE GARDEN GROVE Ociaber -01 <br />$294,900 <br />NAVIN YARD <br />1714) 741-5180 <br />CROSS GUTTER RECONSTRUCTION <br />Fax (714) 741 -5578 <br />13,000s.f. Pec Curb and Gutter, Sidewalk & Wheelchalr Ramps <br />Install Catch Baalns, 4 Traffic Loops, Traffic Smi & L9g9(td5 <br />CITY' OF GARDEN GROVE GARDEN GROVE September -01 <br />$882460 <br />'NAVINIMARU <br />(714) 741-5180 <br />WESTMINSTER AVE. STORM DRAM <br />Fax (714) 741 -5578 <br />Install 1,690 Lf. of 72"-18" RCP <br />CITY OF ARCADIA ARCADIA May -04 <br />$320,255. <br />PAT MALLOY <br />(626)256.8554 <br />FOOTHILL SEWER ADDITION PROJECT <br />Fax (626) 359-701 <br />Install 2,0361J. of 118 manholes <br />LONG BEACH WATEROEPAR769ENT LONG BEACH Mar -m <br />$1,087,881 <br />VANJEW <br />(582) 5704342 <br />PCH OO" CASTIRONMAIN REPLACEMENT <br />Fax (562) 492.9631 <br />Iesia11:3,180 Lf. of 30" Ouctlle Iron Pipe <br />